Reservoir scheduling early warning method based on meteorological numerical forecasting

A numerical prediction and reservoir technology, applied in the flood control and drought relief fields of reservoirs and river basins, can solve problems such as hidden dangers, losses, data and technology shortages of reservoirs and dams, and achieve the effect of improving risk early warning capabilities and ensuring safety.

Active Publication Date: 2020-04-10
STATE GRID ZHEJIANG ELECTRIC POWER
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Benefits of technology

The technical effect described by this patented technology allows planning and controlling the allocation of resources within specific areas during emergency situations such as fires or heavy rain without causing damage or injury. This helps prevent overloading buildings with excessive energy consumption while ensuring safe use of these facilities.

Problems solved by technology

The technical problem addressed in this patents relates to improving the allocation efficiency and planning capabilities of hydroelectric plants (HES) while ensuring proper monitoring and controllability over various factors such as water levels or resource availabilities. Current methods rely heavily upon manual input from field workers who manually determine optimal placement locations within specific areas around the facility's location. This limits their ability to optimize energy production and provide better economic benefit options.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reservoir scheduling early warning method based on meteorological numerical forecasting
  • Reservoir scheduling early warning method based on meteorological numerical forecasting
  • Reservoir scheduling early warning method based on meteorological numerical forecasting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described below in conjunction with accompanying drawing and specific embodiment:

[0032] Such as figure 1 with figure 2 The shown embodiment is a kind of reservoir scheduling early warning method based on meteorological numerical forecast, such as figure 2 As shown, it includes a microprocessor 1, a watershed data collection module 2, a scheduling risk warning module 3 and a cascade reservoir scheduling module 4; The early warning module 33 and the drought resistance early warning module 34; the microprocessor is electrically connected with the watershed data acquisition module, the cascade reservoir dispatching module, the capacity precipitation early warning module, the highest water level early warning module, the flood control early warning module and the drought early warning module; figure 1 shown, including the following steps:

[0033]Step 100, the microprocessor controls the watershed data acquisition module to colle...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a reservoir scheduling early warning method based on meteorological numerical forecasting, which comprises the following steps: calculating the interceptable water storage capacity in a basin according to the acquired hydrological information of each hydropower station in the basin of a target reservoir, and correcting the early-stage influence rainfall Pa according to theinterceptable water storage capacity; determining a runoff coefficient rho according to the hydrological information and the meteorological information, calculating the capacity storage purified wateramount and the capacity storage precipitation amount of the reservoir based on the runoff coefficient rho, and carrying out capacity storage precipitation amount early warning; according to the hydrological information, the drainage basin information, the early-stage influence rainfall Pa, the runoff coefficient rho and the meteorological information, short-term period runoff prediction of the reservoir is conducted, and the medium-term and long-term end water level is calculated; and determining a flood prevention early warning level and a drought resistance early warning level according tothe hydrological information, the meteorological information and the end-of-period water level information, and performing reservoir scheduling. The reservoir scheduling early warning method has the advantages that the reservoir scheduling risk early warning capacity is improved, and life and property safety of reservoir dams and downstream people is ensured.

Description

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Owner STATE GRID ZHEJIANG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products