Tunnel BIM rapid modeling method
A modeling method and tunnel technology, applied in design optimization/simulation, geometric CAD, etc., can solve problems such as low accuracy of tunnel model, incomplete overlap of tunnel centerlines, and inability to effectively adapt to the real situation of the tunnel.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] Such as figure 1 A tunnel BIM rapid modeling method shown includes the following steps:
[0057] Step 1. Draw tunnel plan and tunnel profile:
[0058] Use computer to draw tunnel plan and tunnel longitudinal section in CAD software, and draw shield segment diagram;
[0059] Step 2. Obtain the centerline of the designed tunnel:
[0060] Use the computer to import the drawn tunnel plan and tunnel profile into Civil 3D software, and use the computer to obtain the centerline of the designed tunnel through the "Create Route from Object" tool in the Civil 3D software;
[0061] Step 3. Design the marking label on the centerline of the tunnel:
[0062] Step 301, using a computer to mark a label on the centerline of the designed tunnel through the "Create Road" tool in the Civil 3D software; wherein, the number of labels is multiple, and the distance between two adjacent labels is the ring width of the shield segment;
[0063] Step 40, using a computer to import the design t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com