Intelligent selection and optimization method and system for tunnel excavation and support parameters

A technology for supporting parameters and tunnel excavation, applied in data processing applications, forecasting, instruments, etc., can solve problems such as large human and material resource consumption, human and material resource consumption, and hidden dangers in tunnel safety and stability, so as to avoid human and material resource consumption. , to avoid the effect of deformation and instability

Pending Publication Date: 2020-03-17
CHINA RAILWAY CONSTR HEAVY IND
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For tunnels that exceed the design standards, the construction process will inevitably produce a lot of unnecessary manpower and material resources.
For tunnels that do not meet the design standards, they must be repaired at the end of the construction. Considering the particularity of tunnel construction, repairing the completed tunnels will not only consume a lot of manpower and material resources, but may also contribute to the safety and stability of the tunnel. Sex leaves a hidden danger

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent selection and optimization method and system for tunnel excavation and support parameters
  • Intelligent selection and optimization method and system for tunnel excavation and support parameters
  • Intelligent selection and optimization method and system for tunnel excavation and support parameters

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0042] The implementation of the present invention will be described in detail below in conjunction with the accompanying drawings and examples, so that implementers of the present invention can fully understand how the present invention uses technical means to solve technical problems, and achieve the realization process of technical effects and according to the above-mentioned realization process The present invention is implemented concretely. It should be noted that, as long as there is no conflict, each embodiment and each feature in each embodiment of the present invention can be combined with each other, and the formed technical solutions are all within the protection scope of the present invention.

[0043] In the method of the present invention, after the construction is started, the surrounding rock grade is judged according to the accumulated geological data collected during the construction process, and the judgment result is compared with the analysis result before...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an intelligent selection and optimization method and system for tunnel excavation and support parameters. The method comprises the steps that surrounding rock identification before construction is conducted according to geological data before construction, and primary excavation and supporting parameters are determined based on the surrounding rock identification result; then, based on primary excavation and supporting parameter construction, real-time surrounding rock identification is carried out in combination with geological data collected in the construction process; and the current surrounding rock identification result is compared with the previous surrounding rock identification result, and the excavation and support parameters are optimized according to thecomparison result. According to the method and system, excavation and support parameters of tunnel construction can be optimized, unnecessary manpower and material resource consumption in the tunnelconstruction process is avoided, it is guaranteed that the tunnel construction result more accurately meets the design standard, and the situation that deformation and instability occur after a tunnelis built is avoided.

Description

technical field [0001] The invention relates to the field of tunnel design engineering, in particular to an intelligent selection and optimization method and system for tunnel excavation and support parameters. Background technique [0002] In the field of tunnel engineering, each tunnel has its corresponding design standards, such as tunnel boundaries, tunnel stability, etc. The ultimate goal of tunnel construction is to construct a tunnel that can meet the design standards. [0003] Under the current technical environment, tunnel engineering is usually carried out according to the excavation and support parameters designed and formulated according to the exploration results of the construction environment and the tunnel design standards before construction, and according to the established excavation and support parameters during construction. parameters for construction. However, due to the complexity of the geological environment, there may be many errors and omissions...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/08
CPCG06Q10/04G06Q10/0639G06Q50/08Y02E10/20
Inventor 刘飞香郑大桥秦念稳袁超刘雪霏曾苗筠沈建龙
Owner CHINA RAILWAY CONSTR HEAVY IND
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products