Evaluation method for constructional engineering cost operation

A construction engineering and cost technology, applied in the field of construction cost calculation evaluation, can solve problems such as low cost calculation evaluation efficiency, and achieve the effects of improving data security, preventing loss, and high evaluation efficiency

Inactive Publication Date: 2020-02-07
许对兴
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the existing technology, the amount of construction drawings used in the cost calculation of construction projects is large, resulting in low efficiency of cost calculation evaluation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Evaluation method for constructional engineering cost operation
  • Evaluation method for constructional engineering cost operation
  • Evaluation method for constructional engineering cost operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0037] according to Figure 1-3 The shown evaluation method for construction cost calculation includes a central processing module 1, the input end of the central processing module 1 is provided with a construction drawing import module 2 and a parameter import module 3, and the connection end of the central processing module 1 is provided with Find the same module 4 and the difference module 5, the connection end of the same module 4 and the difference module...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an evaluation method for construction engineering cost operation. The invention relates to the field of engineering cost operation. A central processing module is included, wherein the input end of the central processing module is provided with a construction drawing import module and a parameter import module, the connecting end of the central processing module is providedwith a similarity finding module and a difference module, the connecting end of the similarity finding module and the difference module is provided with a cost evaluation module, and the connecting end of the cost evaluation module is provided with a report generation module. According to the invention, drawings and parameters are analyzed through the similarity finding module and the differencemodule; finding drawings of the same part and drawings of different parts; equally dividing the drawings of the same part into a plurality of parts; one drawing is extracted to be subjected to parallel evaluation with the drawings of the different parts, then the evaluation results of the extracted parts are multiplied by the evaluation results of the drawings of the different parts, and the overall cost evaluation is output, so that the evaluation rate can be effectively improved on the whole, and compared with the prior art, the evaluation efficiency is higher.

Description

technical field [0001] The invention relates to the technical field of engineering cost calculation, and more specifically, the invention relates to an evaluation method for construction cost calculation. Background technique [0002] Project cost is one of the main bases for evaluating the rationality and investment benefits of total investment and sub-item investment. When evaluating the rationality of land prices, construction installation products and equipment prices, it is necessary to use project cost data to evaluate construction project loan repayments. The project cost is also an important basis for evaluating the management level and operating results of construction and installation enterprises. [0003] In the prior art, a large amount of construction drawings is used for cost calculation of construction projects, resulting in low efficiency of cost calculation and evaluation. Contents of the invention [0004] In order to overcome the above-mentioned defects...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q30/02G06Q50/08
CPCG06Q30/0206G06Q50/08
Inventor 许对兴
Owner 许对兴
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products