A project progress and management system technology, applied in the field of project progress management system, can solve the problems of high price, inability to monitor in real time, and inability to provide project management elements, etc., to achieve the effect of wide application range and low price

Pending Publication Date: 2019-12-20
西安市创新人才研究院 +2
View PDF7 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The disadvantages are: 1. Real-time monitoring cannot be conveniently performed; 2. Complete project management elements cannot be provided; 3. The price is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project progress management system
  • Project progress management system
  • Project progress management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0051] Please refer to figure 1 as shown, figure 1 For the working principle block diagram of the present invention, the project schedule management system includes:

[0052] An information input unit, the information input unit includes a user terminal, the user terminal is embedded with a small program, and the small program is used as an entry port of the project progress management system;

[0053] The node data collection and review unit integrates and analyzes the information acquired at the project site, and sends the results to the display unit;

[0054] A display unit, the display unit is used to display the progress of the project. If there is a violation of the operation process, progress delays, personnel changes, quality problems, and changes in supply and demand satisfaction, the display unit will give an early warning.

[0055]Further, the following information input unit is described as an instruction input terminal; the node data collection and audit unit is...

Embodiment 2

[0091] This system has a wide range of application scenarios, and is mainly used for the planned operation management of scientific research, production, and service enterprises with process links. First, the operation management department formulates the plan, the specific execution department implements the plan, and the supervision department conducts acceptance. The three functions can effectively plan, organize, lead, control, and promote project progress.

[0092] The following is an explanation of the company's financial manager recruitment project management process:

[0093] Before the project starts

[0094] System administrator: set company A information, perform enterprise rating on company A, set contract information, and display settings for project kanban information;

[0095] Project manager: maintain project information, set project plan (including project process, time of each stage, key nodes, project team members and member roles, etc.);

[0096] After t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a project progress management system, comprising: an information input unit, with the information input unit comprising a user terminal and a applet being embedded in the user terminal, wherein the applet acts as an entry end of a project progress management system; a node data acquisition and auditing unitused for integrating and analyzing the information acquired on the project site and sending a result to the display unit; and a display unit used for displaying the project progress situation, and giving an early warning if violation of the operation process, progressdelay, personnel change, quality problem and supply and demand satisfaction change occurs. According to the invention, the whole project progress is monitored in real time, the data is linked with themobile phone, and the functions of project progress management, quality management and team building are realized through the combination of the Internet and hardware and by adopting the Internet ofThings communication technology.

Description

technical field [0001] The invention relates to the field of project management, in particular to a project schedule management system. Background technique [0002] Project management is an important management method in the fields of manufacturing, engineering construction, and scientific research. Currently, two methods are used to achieve project progress control. The first is offline Kanban, and the tools are network diagrams or Gantt charts; the second is to use MRP software to complete production schedule management. The disadvantages are: 1. Real-time monitoring cannot be conveniently performed; 2. Complete project management elements cannot be provided; 3. The price is high. [0003] In view of this, it is necessary to improve the shortcomings of the prior art to solve the above problems. Contents of the invention [0004] The purpose of the present invention is to provide a project progress management system, which monitors the progress of the entire project in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/0633G06Q10/103
Inventor 李佩霖朱云刘婷陈雯虞健美李晓尚保铧程晔
Owner 西安市创新人才研究院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products