Layered monitoring target for rock and soil and construction method
A construction method and technology of rock and soil mass, which is applied in the field of foundation soil survey, measuring device, and foundation structure engineering, etc., and can solve the problems that the absolute deformation of rock and soil mass cannot be measured, the data reliability is low, and the applicable depth is limited. , to achieve the effects of low cost of measuring equipment, high data reliability, and large application depth
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] refer to figure 1 , figure 2 As shown, a 4-level layered monitoring standard for rock and soil in a high fill formed by artificial activities, including 4-level monitoring pipes 1-4, centralizer joints arranged on each level of monitoring pipes, and located at each level The protection tube outside the monitoring tube and the monitoring prism 5 installed on the top of each level of monitoring tube, each level of monitoring tube is vertically arranged, and its bottom end is supported on the top surface of its corresponding target rock formation.
[0044] The 4-level monitoring tubes are the first layer of monitoring tube 1 from the innermost layer, the second layer of monitoring tube 2 set outside the first layer of monitoring tube, and the third layer of monitoring tube set outside the second layer of monitoring tube 2 The tube 3 and the fourth layer of monitoring tube 4 sleeved outside the third layer of monitoring tube 3 are coaxially arranged. The diameter of each ...
Embodiment 2
[0066] The monitoring standard of this embodiment can also be applied to the field of rock formation drilling.
[0067] combine Figure 6 and Figure 7 As shown in Fig. 1, firstly, the monitoring horizon and hole depth are determined according to the design requirements, and the drilling structure is designed. The drilling rig drills to the predetermined layer according to the design level 1 aperture and then washes the well, injects 300% mortar into the hole, the amount of grouting should be 3-5 meters above the bottom of the hole, and runs into the level 1 measuring pipe. Spacing (the distance between the centralizers at the lower part of the monitoring pipe can be relatively dense, and the distance between the upper part can be properly sparse, and the distance between the thin monitoring pipes is smaller than that of the thick monitoring pipes, preferably 3 to 12 meters). The monitoring pipes are connected, and after the grout is solidified, the installation of the first...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com