Earth excavation tool for subsurface tunnel and earth excavation method of earth excavation tool
A tunnel and underground excavation technology, which is applied to tunnels, earthwork drilling, mining equipment, etc., can solve the problems of long construction period, manpower and material resources consumption, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] In the present embodiment, the arc support 1 is arched, the width of the chain groove of the arc support 1 is 0.1m, the width of the chain 10 embedded with the chain groove is 0.08m, and the depth of the drill bit 8 drilling out of the groove is 0.8m.
[0033] The soil excavation method for the underground excavation tunnel carried out by the earth excavation tool of the present embodiment is as follows:
[0034] 1) Move the bottom beam 6 to a distance of 1m from the face of the tunnel, make the arc-shaped support 1 parallel to the face of the tunnel, and make the drill bit 8 on the drilling unit face the face of the tunnel;
[0035] 2) The transmission mechanism works, the reducer 11 drives the transmission sprocket 12 to rotate through the transmission shaft 14, the transmission sprocket 12 drives the chain 10 and the driven guide sprocket 13 to rotate, and the chain 10 then drives the axial telescopic drive unit by connecting the bottom frame and the drilling and dig...
Embodiment 2
[0040]In the present embodiment, the arc support 1 is arched, the width of the chain groove of the arc support 1 is 0.3m, the width of the chain embedded with the chain groove is 0.28m, and the depth of the drill bit 8 drilling out of the groove is 1m.
[0041] The soil excavation method for the underground excavation tunnel carried out by the earth excavation tool of the present embodiment is as follows:
[0042] 1) Move the bottom beam 6 to a distance of 1.2m from the face of the tunnel, make the arc support 1 parallel to the face of the tunnel, and make the drill bit 8 on the drilling unit face the face of the tunnel;
[0043] 2) The transmission mechanism works, the reducer 11 drives the transmission sprocket 12 to rotate through the transmission shaft 14, the transmission sprocket 12 drives the chain 10 and the driven guide sprocket 13 to rotate, and the chain 10 then drives the axial telescopic drive unit by connecting the bottom frame and the drilling and digging unit m...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com