One-time overhang construction method for full section of box girder of long-span girder bridge
A construction method and a full-section technology, applied in bridges, bridge construction, bridge materials, etc., can solve the problems of setting interlayer construction joints and long construction periods, and achieve fast formwork installation and removal, light weight, and reduced deformation Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0045] Embodiment: A kind of cantilevered construction method for the full section of the box girder of a long-span girder bridge, refer to figure 1 , 2 , 3, 4, 5, including the following steps:
[0046] a. The hanging basket is installed in place
[0047]The hanging basket is the main carrier of the load-bearing and formwork structure of the box girder full-section one-time cantilevered construction. The hanging basket includes the main truss 1, the suspension and anchoring system 2, the formwork system 3 and the walking system 4. Both the main truss 1 and the formwork system 3 move back and forth through the walking system 4 . The main truss 1 is the main load-bearing structure of the cantilever construction of the box girder. The main truss 1 is an isosceles trapezoidal truss structure. The diagonal brace 14 is located between the upper crossbar 11 and the lower crossbar 12, and the two ends of the diagonal brace 14 are respectively fixed to the upper crossbar 11 and the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com