Quota standardization method for engineering summary table
A technology of budget estimates and quotas, applied in the field of project cost document management, can solve problems such as uneven qualifications, inconsistent descriptions of project budget estimates, and complex construction projects, so as to reduce enterprise costs and improve work efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The present invention will be further described below in conjunction with the accompanying drawings.
[0023] Such as figure 1 As shown, a method for standardizing the quota of the engineering budget estimate table, the method includes the following steps:
[0024] S1. Manually analyze the quota codes, quota names and construction project data rules in the corresponding national quota standards, analyze and split the meaning of each quota name in the national quota standards, and split them according to the different characteristics of each quota name. Several characteristic words, and then further generalize / refine / define the characteristic words in the quota name as characteristic items;
[0025] For example: the quota name corresponding to the quota code "1-8" is "the first and second types of soil excavated by excavator or loose gravel square open excavation method without support", which is split and refined into several characteristic words: "excavated soil Mach...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com