Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Urban reservoir flood control compensation optimization scheduling method

A technology for optimizing scheduling and reservoirs, applied in climate change adaptation, complex mathematical operations, forecasting, etc., can solve the problems of high impermeability of the underlying surface, fast production and confluence speed, limited response time of reservoir scheduling, etc., to achieve rapid and timely scheduling The effect of response

Active Publication Date: 2019-09-13
FUZHOU PLANNING DESIGN & RES INST
View PDF8 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the small catchment area of ​​the urban area from the urban reservoir to the control section, the high impermeability of the underlying surface, and the fast production and confluence speed, the response time of reservoir dispatching is extremely limited, and the calculation of urban hydraulic models is obviously difficult to meet the response time of real-time dispatching of urban flood control and drainage. needs
In addition, there are certain differences between the principles of flood control and dispatch of urban reservoirs and those of basin-type reservoirs, and the factors to be considered are more complicated

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Urban reservoir flood control compensation optimization scheduling method
  • Urban reservoir flood control compensation optimization scheduling method
  • Urban reservoir flood control compensation optimization scheduling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0047] Please refer to figure 2 , the present invention provides an urban reservoir flood control compensation optimization scheduling method, comprising the following steps:

[0048]Step S1: Set the flood control section as M, and divide the flood catchment range N corresponding to the interval between the reservoir dam site and the section M according to the regional topography and topological structure of the pipe network;

[0049] Step S2: Calculate the area of ​​different land use types in the corresponding interval catchment area N between the reservoir dam site and the section, and calculate the net rain process according to formula (1):

[0050]

[0051] In the formula, p(t) is the net rainfall in the period t, P(t) is the rainfall in the period t obtained from the weather forecast, Ψ i is the runoff coefficient of the i-th land use type i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an urban reservoir flood control compensation optimization scheduling method, which comprises the following steps of S1, dividing a water collection range of a corresponding interval flood between a reservoir dam site and a cross section according to a regional topography and a pipe network topological structure; S2, calculating the rain purification process of the incoming water in the interval; S3, simulating and calculating a flow time sequence of the control section based on a historical rainfall process of an interval incoming water collection region; S4, calculating a flow unit line of the incoming water in the interval; S5, in real-time scheduling, calculating an interval incoming water flow process according to the rainfall forecasting process and the flowunit line; S6, constructing a reservoir flood control dispatching objective function; S7, calculating the initial value of the drainage flow at the reservoir moment; and S8, according to the flood control dispatching objective function of the reservoir and the initial value of the drainage flow, calculating the control drainage flow of the reservoir based on the control constraint condition. The method can be used for accurately and effectively carrying out flood regulation calculation of reservoir flood control compensation scheduling.

Description

technical field [0001] The invention relates to the field of urban waterlogging prevention and control, in particular to an optimal scheduling method for urban reservoir flood control compensation. Background technique [0002] In recent years, urban waterlogging is one of the most serious disasters affecting the normal production and life of cities. In order to effectively prevent and control urban waterlogging disasters, most cities have gradually established a set of effective urban flood prevention and control engineering systems, including fast drainage facilities and storage facilities. Reservoirs, park green spaces, etc. Reservoirs are an important part of urban flood control facilities and an important guarantee for urban water safety. At present, the research on optimal flood control dispatching methods for large reservoirs in river basins has developed relatively maturely, while the research on optimal flood control dispatching methods for small urban reservoirs ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/26G06F17/15
CPCG06F17/15G06Q10/04G06Q10/0631G06Q50/26Y02A10/40Y02A90/10
Inventor 蒋艳君陈奕蔡辉艺
Owner FUZHOU PLANNING DESIGN & RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products