Machine room engineering cable arrangement method based on BIM

A cable and equipment room technology, which is applied to the field of cable arrangement in the ground groove of the equipment room, can solve the problems of difficult adjustment of crossover, time-consuming, and increase of crossover parts, etc., and achieves the effect of enhancing controllability and improving efficiency

Active Publication Date: 2019-09-10
通号(长沙)轨道交通控制技术有限公司
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the same as the first scheme, there is a lack of effective methods for checking intersections, mainly relying on the arrangement experience of technicians; in addition, the intersections generated by this scheme are difficult to adjust, and local intersections lead to repeated revisions of the scheme, which consumes a lot of time and effort. Still can't get a more reasonable layout plan after working hard
[0009] In order to make reasonable use of the layout space, it is necessary to plan in advance the number of rows of cables placed on the same section of the floor trough or cable rack, and reduce the overall height of the cables by increasing the number of rows to achieve the purpose of making full use of the layout space , increasing the number of columns will easily lead to an increase in the number of intersections, so it is necessary to screen and classify the cables in advance to avoid crossings while increasing the number of columns, which is impossible for the traditional cable arrangement scheme that relies on the experience of technicians. realized

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Machine room engineering cable arrangement method based on BIM
  • Machine room engineering cable arrangement method based on BIM
  • Machine room engineering cable arrangement method based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0065] The present invention will be further described below in conjunction with the drawings and embodiments.

[0066] Refer to the flow chart, a BIM-based method of cable arrangement for computer room engineering, see Picture 9 , Including the following steps:

[0067] 1) According to the specific construction requirements of the cable in the computer room, organize and summarize the relevant information of the cable, the relevant information includes the cable type, quantity, wire diameter, and the number of the beginning and end of the cabinet;

[0068] 2) Develop a cable arrangement plan, specifically:

[0069] (1) Number the cabinets in descending order from the trough to the adjacent row, such as Figure 8 As shown, the openings leading to the outside of the computer room are numbered according to the cabinet numbering principle;

[0070] (2) After the cabinet numbering is completed, subtract the largest cabinet number from the smallest cabinet number to determine the maximum di...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a machine room engineering cable arrangement method based on BIM, which comprises the following steps: 1, numbering cabinets according to a sequence from small to large in a direction from a geosyncline to an adjacent row, and numbering holes leading to the outside of a machine room according to a cabinet numbering principle; 2, after cabinet numbering is completed, subtracting the maximum cabinet number from the minimum cabinet number, and determining the maximum difference value of the cabinet numbers; 3, calculating the maximum number of cables which are allowed to be arranged; 4, arranging and gathering all cables in the machine room; 5, formulating an arrangement sequence of different wire diameters; and step 6, completing the arrangement of all cables according to the cable arrangement basis. According to the method, corresponding staggered layer arrangement processing and the like are carried out in advance according to the intersection points of cable arrangement, so that intersection during cable arrangement is reduced, the aesthetic property of engineering cables in a geosyncline is improved, three-dimensional modeling is carried out on a cable wiring project by utilizing a BIM technology, implementation is carried out according to a model, and the method is more visual and rapid.

Description

Technical field [0001] The present invention relates to the field of BIM application technology, and in particular to a method for arranging cables in a trough of a machine room based on BIM. Background technique [0002] BIM (Building Information Modeling, that is, building information modeling) has a powerful three-dimensional design function, with the characteristics of three-dimensional visualization, collaboration and information extraction. All structural components in BIM are three-dimensional entities, providing complete information, and the three-dimensional display is intuitive and can be observed in real time, which can well detect the rationality of the structure layout and the characteristics of the detailed structure. The comprehensive application of BIM will greatly improve the degree of informatization of construction projects and have a huge impact on the progress of construction-related construction technology. [0003] In the fields of urban rail transit, high-s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06T17/10H05K7/14
CPCG06T17/10H05K7/1498G06F30/367
Inventor 向洪懿李焕祝兴燕吴聪颖任自东刘子明
Owner 通号(长沙)轨道交通控制技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products