Mountainous building site selection method
A technology for mountain and construction land, applied in the direction of data processing application, forecasting, calculation, etc., can solve the problems of no general layout plan, no quantitative indicators, no quantification, etc., to avoid subjective judgment errors and subjective judgments , cost-saving effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] It is planned to build a new school and provide three mountain lands A, B, and C for selection. The land area of each mountain land is: AS1=161629 m 2 ;BS2=172310 m 2 ;CS3=148229m 2 .
[0017] The site selection method for mountain buildings provided by the invention comprises the following steps:
[0018] 1) According to the total land area of the construction project, select three mountain lands, and the land area of each mountain land is: AS1=161629 m 2 ;BS2=172310 m 2 ;CS3= 148229 m 2 ;
[0019] 2) The heights of the three mountains are measured as AH1=11 m, BH2=96 m, CH3=95 m, and the perimeters are AL1=1610 m, BL2=1806 m, CL3=2389 m; the heights are The height value obtained by subtracting the height of the lowest point from the height of the highest point within the range of building land A, B, and C;
[0020] 3) Calculate the radius r of the three mountains by using the total area AS1, BS2, CS3 in step 1) and the heights AH1, BH2, CH3 in step 2...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com