Comprehensive evaluation method for shield tunnel construction risk
A technology for comprehensive evaluation and shield tunneling, which is applied in tunnels, earthwork drilling and mining, resources, etc., can solve the problems of ambiguity and randomness in risk evaluation, eliminate randomness, facilitate dynamic guidance, and improve efficiency. sticky effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] Such as figure 1 Shown is the shield tunnel construction risk comprehensive evaluation flow chart of the present invention, comprises steps:
[0033] (S1) Construct a single-layer index system for comprehensive risk assessment of shield tunnel construction, or a tree-like index system with more than two layers;
[0034] (S2) Determine the construction risk comprehensive evaluation grade standard and the corresponding construction risk comprehensive evaluation standard cloud model system and cloud map;
[0035] (S3) Determine the evaluation language system of the evaluation index weight and its corresponding weight cloud model system;
[0036] (S4) Determining the evaluation language system of the evaluation index safety state level and the corresponding safety state evaluation cloud model system;
[0037] (S5) assess the weight clou...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com