TOPSIS method based non-base-bid-price commercial bid evaluation method
A business and program technology, applied in the field of commercial bid evaluation without a base bid, to achieve scientific and reasonable index weights and a wide range of applications
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Embodiment 1: Select the quotation part of the commercial bid for the above-ground part of the residential building construction and decoration project in a residential area to evaluate the bid, m is 14, such as figure 1 As shown, this is the flow chart of the evaluation method for commercial bids without base bids based on the TOPSIS method, and the specific steps are:
[0051]The 14 bidding units are taken as the alternative scheme set, and the above-ground part list items of all construction and decoration projects in the bidding quotation are used as attribute vectors to measure the pros and cons of the scheme: According to the residential building construction and construction of 14 bidding units in a residential district bidding project For the above-ground part of the decoration project, the bidding price is evaluated, and the engineering level index of the bidding unit is evaluated, and X indicates the alternative plan set of all bidding units, and x 1 ,x 2 ,.....
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com