Frost heave prevention pile and construction method
A construction method and anti-frost heave technology, which can be used in infrastructure engineering, protection devices, buildings, etc., can solve the problems of high engineering cost, large length and length of reinforcement, and achieve the effects of low cost, reduced labor cost, and high speed.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] An anti-frost heave pile, which comprises: a prefabricated pile, the upper part of the prefabricated pile has an anti-frost heave annular layer, and the anti-freeze heave annular layer is composed of an anti-frost heave material.
Embodiment 2
[0018] According to the anti-frost pile described in embodiment 1, the pile body of the prefabricated pile is coated with asphalt or wrapped with linoleum, the described anti-frost annular layer is backfilled sand, and the top of the anti-frost annular layer has a layer of waterproof cohesive soil, so The prefabricated piles mentioned above are concrete prefabricated piles or steel piles.
Embodiment 3
[0020] In the construction method of the above-mentioned anti-frost pile, after the working surface is leveled, a drilling rig is used to drill the anti-freeze hole 1, and then a prefabricated pile 2 is implanted in the anti-freeze hole. The remaining space is filled.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com