A technology of problem data and implementation methods, applied in the power IT field, can solve the problems of long data release cycle, lack of closed-loop management of data, and low efficiency of problem data correction, so as to improve the level of data quality management, solve the problem of long release cycle, and improve correction The effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] Embodiment 1 of a problem data governance auxiliary system provided by the present invention is as follows, including:
[0040] The background end is used to generate a site survey task list, send the site survey task list to the mobile terminal, and receive the site inspection result data sent by the mobile terminal;
[0041] The mobile terminal is used to download the on-site survey task list generated by the back-end and feed back the on-site inspection result data obtained by the on-site inspectors to the back-end; generate corresponding modification requests, and send the modification requests to external business systems.
Embodiment 2
[0042] see figure 1 , Embodiment 2 of a problem data governance auxiliary system provided by the present invention is as follows, including:
[0043] An auxiliary system for problem data governance, comprising:
[0044] The background end is used to generate a site survey task list, send the site survey task list to the mobile terminal, and receive the site inspection result data sent by the mobile terminal;
[0045] Specifically, the backend can include:
[0046] Provincial quality system, which automatically or manually obtains the problem data details of the current period according to the audit data configuration items, and then splits the problem data details to obtain preprocessed data. For example, the split method can be to divide the problem data into different types , and then saved as preprocessed data after different power supply stations.
[0047] The data processing application terminal is used to process the preprocessed data obtained by the provincial qualit...
Embodiment 3
[0061] The third embodiment of the data governance auxiliary realization method of the problem of the present invention is as follows:
[0062] see Figure 4 , the system implementation method includes the following steps:
[0063] Step P1: The provincial quality system obtains the problem data details of the current period according to the audit data configuration items, and then splits them to obtain preprocessed data;
[0064] Step P2: Filter the pre-processed data through the data processing application terminal, and generate the on-site survey task list automatically according to the program instruction or configuration timing;
[0065] Step P3: After obtaining the on-site survey task list generated by the background terminal through the mobile operation platform, use the on-site inspection terminal to download the site survey task list on the mobile operation platform;
[0066] Step P4: After the on-site inspectors input the on-site inspection result data into the on-s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com