Advance Excavation Method of Pilot Pit with Multiple Steps Under Frozen Advance Support

An advanced support, multi-step technology, applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of not considering the particularity of frozen soil, slow excavation speed of frozen soil strength, and high total cost, saving freezing Costs, total cost savings, and the effect of fast excavation

Active Publication Date: 2019-08-16
CCCC SECOND HIGHWAY CONSULTANTS CO LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The core principle of the freezing method excavation method in the prior art is to construct the initial support as soon as possible, and the initial support is quickly closed to form a ring, without considering the particularity of the frozen soil during the excavation process—the frozen soil near the excavation area Due to the influence of air convection, the temperature gradually rises and the strength is lost, while the frozen soil far away from the excavation area is not affected by air convection and still has high strength
Therefore, the existing construction method fails to effectively utilize the strength of frozen soil and the excavation speed is slow, and the time of freezing construction is directly proportional to the cost, so the total cost is relatively high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Advance Excavation Method of Pilot Pit with Multiple Steps Under Frozen Advance Support
  • Advance Excavation Method of Pilot Pit with Multiple Steps Under Frozen Advance Support
  • Advance Excavation Method of Pilot Pit with Multiple Steps Under Frozen Advance Support

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0036] The first excavation method of the multi-step pilot pit under the frozen advanced support, the steps are:

[0037] Step 1, such as figure 1 As shown in Fig. 1, the freezing pipes are set horizontally along the tunnel outside the excavation contour line, and the surrounding soil is cooled by circulating the salt solution in the freezing pipes to form the advanced support of the frozen soil pipes; when setting the freezing pipes, the excavation Horizontal pipe jacking is set outside the contour line, and then the frozen pipe is set in the horizontal pipe jacking. The width and height of the excavation face of the end face of the tunnel are both greater than or equal to 9m;

[0038] Step 2, such as figure 2 As shown, under the action of the advance support of frozen soil pipes, the tunnel is excavated in at least 3 steps from top to bottom, and the lay...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-step middle drift heading advance excavation method under freezing forepoling. The multi-step middle drift heading advance excavation method comprises the steps that afreezing pipe is arranged horizontally along a tunnel on the outer side of an excavation contour line in advance, and surrounding soil bodies are refrigerated through a circulating salt solution in the freezing pipe to form frozen soil pipe curtain group forepoling; the tunnel is divided into at least three steps from top to bottom for excavation, the layer where each step is located is divided into a middle drift heading, a left drift heading and a right drift heading for excavation, the middle drift heading is excavated first, and then the left drift heading and the right drift heading are excavated; and a tunnel lining and a waterproof layer are constructed from bottom to top, and freezing construction of the freezing pipe is stopped. Under the support effect of the frozen soil pipe curtain group forepoling, the strength of frozen soil is fully utilized to speed up the excavation in the tunnel, the advantages of safety and reliability are achieved, the construction period can be greatly shortened and the construction cost can be greatly saved.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a method for first excavating a pilot pit with multiple steps under the freezing advance support. Background technique [0002] The artificial ground freezing method has become one of the main means of underground engineering construction because it is basically not limited by the support range and support depth, and has an absolute water sealing effect. Underground excavation construction under frozen advanced support generally adopts traditional mine construction methods, such as step method and CRD method. [0003] The core principle of the freezing method excavation method in the prior art is to construct the initial support as soon as possible, and the initial support is quickly closed to form a ring, without considering the particularity of the frozen soil during the excavation process—the frozen soil near the excavation area Due to the influence of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/00
CPCE21D9/00E21D9/001
Inventor 程勇刘继国周先平魏龙海舒恒张军任辉刘应亮
Owner CCCC SECOND HIGHWAY CONSULTANTS CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products