Six-pilot-tunnel twelve-step underground space excavation support and protection method

A technology for underground space and pilot tunnels, which is applied in underground chambers, earthwork drilling, wellbore lining, etc. It can solve problems such as low construction efficiency and poor safety, reduce idle work and cross operations, achieve outstanding results, and improve construction efficiency Effect

Active Publication Date: 2018-08-07
JINAN URBAN CONSTR GRP +1
View PDF5 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, the existing methods of preventing land subsidence and the secondary disasters it brings have poor safety and low construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Six-pilot-tunnel twelve-step underground space excavation support and protection method
  • Six-pilot-tunnel twelve-step underground space excavation support and protection method
  • Six-pilot-tunnel twelve-step underground space excavation support and protection method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0036] Taking the underground civil air defense shopping mall with an excavation width of 25.2 meters and a height of 5.6 meters as an example, the excavation and support method of underground space with six pilot holes and twelve steps is used for construction.

[0037] Such as Figure 1-4 As shown, the twelve-step underground space excavation and support method for six pilot tunnels includes steps:

[0038] 1) Advance support construction

[0039] In order to protect the underground pipeline facilities, prevent the sand layer from collapsing and ensure construction safety, auxiliary measures such as advance support for the surrounding rock shall be taken before the construction of the cross passage.

[0040] Before the construction of the cross passage, the front large pipe shed 8 and the small pipe 9 are used for grouting at the position of the straight wall and flat roof of the outer contour line to reinforce the loose surrounding rock, thereby forming a beam and shell ef...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a six-pilot-tunnel twelve-step underground space excavation support and protection method and belongs to the field of construction engineering. According to the method, outer contour line straight walls are excavated first along a structure and a phi108 advanced large pipe shed is arranged at a flat top position, and the outer contour line straight walls and the phi108 advanced large pipe shed are used as an integral support of an underground space after grouting; according to the size of the structure, an excavation section is divided into six pilot tunnels, and each pilot tunnel is divided into upper and lower steps and excavated in two steps, so that there are six pilot tunnels excavated in twelve steps in total; every two adjacent pilot tunnels are excavated ina jumped manner and staggered in the front and rear direction, the first, third and fifth pilot tunnels are first constructed, and then the second, fourth and sixth pilot tunnels are constructed. In this way, the large section is integrally broken into parts, the exposed area of a tunnel face is reduced, and the second, fourth and sixth pilot tunnels are constructed later, for example, three pieces of core soil stabilize ground loads. After the first, third and fifth pilot tunnels are closed into loops and the settlement is stable, the second, fourth and sixth pilot tunnels are excavated, so that the relative settlement is less, and the excavation is faster. The method has good safety and high efficiency.

Description

technical field [0001] The invention relates to the field of construction engineering, in particular to a six-pilot twelve-step underground space excavation and support method. Background technique [0002] In the current process of urbanization, the land in the core built-up area is particularly scarce, and the development of underground space is becoming more and more urgent. In the built-up area, the ground pipelines are generally dense, the traffic flow is relatively large, and there are many surrounding buildings and structures. The construction space that can be provided is small and the method of large excavation cannot be adopted. Moreover, the excavation section is irregular, and it is not easy to adopt standardized mechanical operations. The development of underground spaces such as street crossing passages, underground parking lots, and underground civil air defense shopping malls should improve investment efficiency. The burial should not be too deep, and the de...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10E21D9/14
Inventor 金宝李洪霞郭建丁群秘宝星费文涛王开龙秦龙
Owner JINAN URBAN CONSTR GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products