Grooving device for mounting building monitoring equipment
A monitoring equipment and installation technology, applied in the field of slotting devices for building monitoring equipment installation, can solve the problems of uneven slotting, affecting the surrounding environment, time-consuming and labor-intensive, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] A slotting device for building monitoring equipment installation, such as Figure 1-4 As shown, it includes a riser 1, a handle 3, a frame 4, a cutting machine 5, a saw blade 6, a first button 7, a second button 8, a moving device 9 and a dust removal device 10, and the middle part of the riser 1 has an opening 2, A frame 4 is installed in the middle part of the right side of the riser 1, and a mobile device 9 is arranged in the frame 4. The mobile device 9 is connected with a cutting machine 5, and the cutting machine 5 is connected with a saw blade 6. The saw blade 6 is located in the opening 2, and the frame 4. The lower part of the right side is provided with a dust removal device 10. The handle 3 is installed symmetrically on the upper and lower sides of the right side of the vertical plate 1. The first button 7 is installed in the middle of the right side of the upper handle 3. The first button 7 is connected with the mobile device 9. There is circuit connection, ...
Embodiment 2
[0032] A slotting device for building monitoring equipment installation, such as Figure 1-4 As shown, it includes a riser 1, a handle 3, a frame 4, a cutting machine 5, a saw blade 6, a first button 7, a second button 8, a moving device 9 and a dust removal device 10, and the middle part of the riser 1 has an opening 2, A frame 4 is installed in the middle part of the right side of the riser 1, and a mobile device 9 is arranged in the frame 4. The mobile device 9 is connected with a cutting machine 5, and the cutting machine 5 is connected with a saw blade 6. The saw blade 6 is located in the opening 2, and the frame 4. The lower part of the right side is provided with a dust removal device 10. The handle 3 is installed symmetrically on the upper and lower sides of the right side of the vertical plate 1. The first button 7 is installed in the middle of the right side of the upper handle 3. The first button 7 is connected with the mobile device 9. There is circuit connection, ...
Embodiment 3
[0035] A slotting device for building monitoring equipment installation, such as Figure 1-4 As shown, it includes a riser 1, a handle 3, a frame 4, a cutting machine 5, a saw blade 6, a first button 7, a second button 8, a moving device 9 and a dust removal device 10, and the middle part of the riser 1 has an opening 2, A frame 4 is installed in the middle part of the right side of the riser 1, and a mobile device 9 is arranged in the frame 4. The mobile device 9 is connected with a cutting machine 5, and the cutting machine 5 is connected with a saw blade 6. The saw blade 6 is located in the opening 2, and the frame 4. The lower part of the right side is provided with a dust removal device 10. The handle 3 is installed symmetrically on the upper and lower sides of the right side of the vertical plate 1. The first button 7 is installed in the middle of the right side of the upper handle 3. The first button 7 is connected with the mobile device 9. There is circuit connection, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com