Ecological protection structure of rock slope and construction method of structure
A technology for ecological protection and slope, applied in infrastructure engineering, botanical equipment and methods, excavation, etc., can solve problems such as waste of resources, backward tire retreading technology, environmental pollution, etc., and achieve direct radiation reduction, efficient construction, and simple operation Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] Such as figure 1 and figure 2 As shown, an ecological protection structure for a rocky slope includes a plurality of semicircular tires 1, a plurality of fixing rods 2, and planting soil 3 and green plants 4 located in the semicircular tires 1. The semicircular tire 1 is cut from waste automobile tires. The semicircular tire 1 includes two semicircular sidewalls 11 , wherein one sidewall 11 sticks on the slope 5 . The opening of the semi-circular tire 1 faces upwards to form a groove 12, and planting soil 3 and green plants 4 are arranged in the groove 12.
[0046] Such as figure 2 As shown, each semicircle tire 1 is attached to the side wall 11 of the slope 5 and is provided with a plurality of fixing holes 13, which can be two. Place the semicircular tire on 1 inner diameter. Each fixing hole 13 places is provided with a fixing rod 2, and a part of fixing rod 2 is inserted in the rock slope 5, and a part of the leakage slope 5 passes through the fixing hole 13, ...
Embodiment 2
[0056] The difference from Embodiment 1 is that: figure 1 As shown, a plurality of semicircle tires 1 are arranged on the slope surface 5 in a quincunx shape. This arrangement reduces the number of semicircle tires 1 and reduces the construction workload, and the upper and lower rows of semicircle tires 1 arranged in an offset manner can also be used for Rolling Stones made an effective interception. This arrangement is suitable for slope protection on rocky slopes with slow weathering and gentle slopes.
[0057] Such as Image 6 As shown, the anti-off piece 6 is an anti-off block 63 that is threadedly connected with the fixed rod 2, and the size of the anti-off block 63 is larger than the fixing hole 13 on the semicircle tire 1. During installation, after the semicircle tire 1 is hung on the fixed bar 2, the anti-off block 63 is screwed into the fixed bar 2 and the compressed semicircle tire 1 is pasted on the side wall 11 of the slope 5. This method is easy to operate and...
Embodiment 3
[0060] A construction method for an ecological protection structure of a rock slope, comprising the following construction steps:
[0061] Step a, cutting the waste automobile tires radially into two semicircle tires 1, and at least two fixing holes 13 are provided on a side wall 11 of the semicircle tires 1, which may be two, and the two fixing holes 13 are provided respectively At both ends of the arc and close to the inner diameter of the semicircle tire 1;
[0062] Step b, using a small drilling rig to drill holes on the slope 5 according to the position of the fixing hole 13 of the semicircular tire 1;
[0063] Step c, insert the threaded fixing rod 2 at one end into the drilled hole so that the threaded end leaks out of the slope 5, and pour cement slurry or planting glue into the gap between the fixed rod 2 and the drilled hole; Set the fixing hole 13 of the semicircular tire 1 on the leaking fixing rod 2, so that it forms a groove 12 attached to the slope surface 5 wi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com