Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Mining/setting-up integrated mining technology without tunneling and coal pillar

A technology without coal pillars and processes, applied in ground mining, earthwork drilling, underground mining, etc., can solve the problems of waste of resources, low production efficiency, waste of coal resources, etc., to reduce production costs, improve resource recovery rates, increase The effect of enterprise economic benefits

Active Publication Date: 2018-04-06
CHINA NAT COAL GROUP CORP +2
View PDF6 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to solve the tension in production continuity caused by the traditional mining method of digging two lanes on one side and leaving coal pillars in the current longwall mining, the engineering volume of the well lane is large, the waste of resources is more, the production cost is high, and the production efficiency is low. In order to solve the practical problems, a non-excavation and coal pillar-free integrated mining technology is provided. Through reasonable mining process arrangements, the mining and retention integrated mining without coal pillars can be realized, and the unbalanced mining and continuous tension caused by the traditional excavation before mining are avoided. Avoid the waste of coal resources caused by leaving large coal pillars

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mining/setting-up integrated mining technology without tunneling and coal pillar
  • Mining/setting-up integrated mining technology without tunneling and coal pillar
  • Mining/setting-up integrated mining technology without tunneling and coal pillar

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The specific technical solutions of the present invention will be described in detail below in conjunction with the accompanying drawings, but this does not mean to limit the protection scope of the present invention.

[0034] Such as figure 1 As shown, the present invention provides a non-driving and non-pillar-free mining and retention integrated mining technology, the first selected coal seam is stable, the coal seam is small inclination, the geological structure is proven, uncomplicated, and the mining area with good hydrogeological conditions, and Divide the mining area into several large-section working faces and several small-section working faces, and arrange alternately according to the small-section working face, large-section working face and small-section working face. According to the actual situation of each mine, the small section The working face width is half of the working face width of the large section, and the inclined length is consistent with the leng...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a mining / setting-up integrated mining technology without tunneling and coal pillars, which includes the following steps: selecting a mining area and dividing the mining area into large section working surfaces and small section working surfaces; performing construction of in-advance guiding roadways and setting in-advance open-off cuts, thus completing preparation work of mining; firstly, mining the small section working surfaces, after two of the small section working surfaces are mined, mining the large section working surfaces in a retreating mining mode, wherein theutilized secondary small section retrained roadway is subjected to roof cutting and pressure relieving for secondary roadway retraining, and a Y-shaped ventilating system is formed in the large section working surfaces; then performing secondary cyclic mining, wherein the utilized small section retrained roadway in the secondary circulation is subjected to secondary roof cutting and roadway retraining so that a Y-shaped ventilating system is formed in the large section working surfaces; and alternately mining the small section working surfaces and the large section working surfaces until themining area is mined completely. The method is free of crossheading tunneling and is free of coal pillars, allows continuous mining, and has important significance of increasing resource recovery ratein a mine, reducing tunneling, increasing production efficiency, cutting payrolls and increasing efficiency, and has great practicability.

Description

Technical field [0001] The invention belongs to the technical field of mining engineering, and specifically relates to an integrated mining process without excavation and no coal pillars. Background technique [0002] At this stage, China’s coal production is mostly dominated by longwall retreat mining. The mining area is mainly divided into several sections, and the section working face is used as the production unit to organize production. Generally, the working face roadway and the open cut in the section are excavated first. After the equipment of the working face is installed in place, the retreat mining is carried out, and the continuation working face roadway of the next section is excavated at the same time, and the preparation of the continuation working face roadway is completed before the mining face is completed, and then the house is moved upside down, and a new cycle is restarted until the whole In order to maintain the stability of the roadway roof in the continuou...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21C41/18
CPCE21C41/18
Inventor 祁和刚蔡峰宫守才郑忠友朱磊杨晓科刘成勇李学强刘文涛
Owner CHINA NAT COAL GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products