YARN-based GPGPU cluster-oriented resource management scheduling method
A technology of resource management and scheduling method, which is applied in the field of resource management and scheduling for GPGPU clusters, and can solve problems such as the inability to support GPU resource management and allocation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0045] Such as figure 2 As shown, the GPU cluster of the present invention is based on the improvement of the original YARN framework, and a GPU cluster management method is invented, so that GPU resources are visible, manageable, and schedulable at the cluster layer.
[0046] The YARN system of the present invention supports CPU (X86, ARM etc.), memory and GPU (the GPU of NVIDIA and the corresponding CUDA programming framework are used as examples in this valve, but the present invention is not limited to the GPU of NVIDIA).
[0047] The CPU and memory are "yarn.nodemanager.resource.memory-mb" and "yarn.nodemanager.resource.cpu-vcores", which are consistent with the original YARN, but need to increase the representation of GPU resources.
[0048] Add the representation of GPU type and quantity in YARN, for example, "yarn.nodemanager.resource.gpu-type" indicates the type of GPU, and "yarn.nodemanager.reosurce.gpu-ngpgpu" indicates the number of physically available general-purp...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com