Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Dynamic computing method for construction period of submarine cable operation

A calculation method and submarine cable technology, applied in calculation, computer-aided design, instruments, etc., can solve problems such as high precision requirements, complicated submarine cable laying construction process, and inability to quantitatively evaluate the construction period, and achieve the effect of improving construction efficiency.

Active Publication Date: 2017-11-24
NAVAL UNIV OF ENG PLA +1
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The construction process of submarine cable laying is complex and has high precision requirements, and the construction period cannot be quantitatively evaluated during the construction process. Therefore, it is necessary to provide a method for the management process of submarine cable construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic computing method for construction period of submarine cable operation
  • Dynamic computing method for construction period of submarine cable operation
  • Dynamic computing method for construction period of submarine cable operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] In order to express the present invention more clearly, the present invention will be further described below in conjunction with the accompanying drawings.

[0052] A method for dynamically calculating the construction period of a submarine cable operation realized by the present invention is applied to a service terminal, and the method is used to control the cost of the construction period of each link in the construction process of the submarine cable. The method includes:

[0053] Step 1. Establish a seabed profile model according to the surveyed seabed parameters, use CAD files to pick up water depth layer data and geological layer data, and establish a seabed profile diagram;

[0054] Step 2. According to the set construction start coordinate point. The starting coordinate point will be decomposed into the starting point and the normal speed point; the starting point: the speed is 0 point, which can be set at the starting point of the path or a certain routing po...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a dynamic computing method for a construction period of submarine cable operation. The method includes the steps of firstly building a seabed profile model according to prospected seabed parameters, and setting a construction starting coordinate point; according to the construction coordinate point and the default speed of submarine cables, building a margin model, a submarine-cable type transition coordinate point and a grounding coordinate point, obtaining a submarine cable laying length model, creating a gradient critical-point coordinate point, building a ship speed adjusting model and a transition margin adjusting model, setting a construction ending coordinate point, and then creating a margin model; finally obtaining construction period data, and determining the construction period of the implementation scheme which needs to be executed. According to the dynamic computing method for the construction period of the submarine cable operation, by setting and computing the seabed profile model, the construction coordinate points and corresponding data are obtained to achieve full-period instruction and construction period control of submarine cable laying, and therefore laying work of the submarine cables can be conducted successfully and effectively, and more convenience is provided for people to precisely and timely monitor the process of submarine cable laying so that construction efficiency is improved and a controllable construction period is ensured.

Description

technical field [0001] The invention relates to the technical field of submarine cable routing, in particular to a method for controlling the construction period of a submarine cable operation. Background technique [0002] With the development of communication technology, information exchange has become more and more common. Long-distance communication requires the installation of communication cables to ensure the rapid transmission of information. [0003] my country's coastline is about 18,000 kilometers, and it has more than 5,000 islands or islands. Some of these islands or islands have long-term human populations. Both the development of islands and the protection of sea area resources require the establishment of a submarine cable communication resource network. Compared with the difficulty of laying submarine cables on land, it can be seen that the difficulty of laying submarine cables on the seabed is average. With the rapid development of various technologies toda...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCG06F30/18G06F2113/16
Inventor 任飞冯祥成吕共欣
Owner NAVAL UNIV OF ENG PLA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products