Intelligent management system/method for building project, readable storage medium and terminal
An intelligent management system and project technology, applied in the field of construction engineering application management, can solve problems such as poor experience, achieve good experience, improve management efficiency, and realize the effect of paperless management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] This embodiment provides an intelligent management system for a construction project, characterized in that it includes:
[0046] a storage module for storing the construction model of the construction project;
[0047] a display module, receiving a model display instruction to display the building model;
[0048] A project information search module receives a project information viewing instruction to search for project information of a construction project, and displays the project information through the display module;
[0049] The component search module is used to search for the building information of the building components; the building information of the components is the data information describing the building components that make up the building model;
[0050] Project problem management module, which creates problem events and supervises the problem events;
[0051] The observation operation module receives an observation instruction, and executes an obs...
Embodiment 2
[0108] This embodiment provides an intelligent management method for a construction project. The intelligent management method for a construction project includes the following steps:
[0109] storing an architectural model of said architectural project;
[0110] receiving a model display instruction to display the building model;
[0111] Receive a project information viewing instruction, search for the project information of the construction project, and display the project information through the displayed module; or
[0112] look up architectural information of a building component; the architectural information of said component is data information describing the building components that make up said building model; or
[0113] create problem events, and monitor the problem events created; or
[0114] An observation instruction is received, and an observation operation associated with the building model is performed according to the observation instruction.
[0115] Th...
Embodiment 3
[0167] This embodiment provides a terminal, including: a processor, a memory, a transceiver, a communication interface, and a system bus; the memory and the communication interface are connected to the processor and the transceiver through the system bus to complete mutual communication, and the memory is used to store computer program, the communication interface is used to communicate with other devices, the processor and the transceiver are used to run the computer program, and the terminal executes steps S31 to S37, steps S31 to S36', or steps S31 to S31 in the intelligent management method for construction projects as described above S36".
[0168] The system bus mentioned above may be a Peripheral Component Interconnect (PCI for short) bus or an Extended Industry Standard Architecture (EISA for short) bus or the like. The system bus can be divided into address bus, data bus, control bus and so on. For ease of representation, only one thick line is used in the figure, bu...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com