Adsorption and desorption/exploitation simulated experimental device and method of shale gas

A simulation experiment device, adsorption and desorption technology, which is applied in material inspection products, instruments, analytical materials, etc., can solve the problems of reduced control accuracy, low measurement accuracy, and the reliability of simulation test results without mining. The effect of saving equipment investment cost

Active Publication Date: 2017-11-14
CHINA PETROLEUM & CHEM CORP +1
View PDF5 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Patent document CN102944666A discloses a shale gas reservoir mining simulation experiment device, although the experimental device can be used to conduct adsorption / desorption experiments on large-scale shale cores, and to study the gas adsorption / desorption of large-scale shale cores under different conditions In addition, adsorption, desorption and mining simulation experiments can be carried out at the same time, but the measurement accuracy of the gas production measurement method is low under high temperature and high pressure, and the control and measurement of production pressure and flow rate under high temperature and high pressure in the mining simulation experiment are the key to the mining technology , at the same time, the technical solution of this patent document cannot realize the mining simulation experiment under the fixed production mode
[0004] There are also some patent documents disclosed in the mining simulation experiment that the back pressure control is realized through the backflow valve. After a long time of use, the control accuracy is reduced, and the accurate measurement of the gas production under high temperature and high pressure cannot be realized, and the reliability of the mining simulation test results cannot be guaranteed. sex
In addition, the existing equipment used in mining simulation experiments cannot carry out mining simulation experiments under the two working systems of constant pressure and fixed production

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Adsorption and desorption/exploitation simulated experimental device and method of shale gas
  • Adsorption and desorption/exploitation simulated experimental device and method of shale gas
  • Adsorption and desorption/exploitation simulated experimental device and method of shale gas

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0066] A shale mining simulation experiment method, the method comprising:

[0067] A. After the adsorption experiment is over, carry out the constant pressure mining simulation experiment:

[0068] 1) The volume V of the sample is measured before the experiment 样 , mass m measurement, the sum of the volume V of the volume of the sample cylinder 5 and the volume of the pipeline between the cylinder body and the valve 8 下 Carry out calibration, the temperature T of setting thermostat 11 is experimental temperature;

[0069] 2) Close valve 1 and open valve 8;

[0070] 3) After the system pressure formed by the sample cylinder 5, the piston intermediate container 6 and the pipeline is stable, the initial pressure P is recorded by the pressure sensor 7, and the valve 8 is closed;

[0071] 4) Set the high-precision plunger pump 10 to the constant pressure mode, and set the pump pressure to the first experimental pressure value. At this time, start to withdraw the pump. After the...

Embodiment 2

[0086] A shale mining simulation experiment method, the method comprising:

[0087] A. After the adsorption experiment is over, carry out the production-fixed mining simulation experiment:

[0088] 1) Ensure that the piston of the piston-type intermediate container 6 is at the top before the experiment; 样 , mass m metering, the sum of the volume V of the volume of the sample cylinder 5 and its connected pipeline and the volume of the piston upper end space in the piston intermediate container 6 下 Carry out calibration, the temperature T of setting thermostat 11 is experimental temperature;

[0089] 2) Close valve 1 and open valve 8;

[0090] 3) After the system pressure formed by the sample cylinder 5, the piston-type intermediate container 6 and the pipeline is stable, the initial pressure P is recorded by the pressure sensor 7, and the cumulative gas production volume of the high-precision plunger pump 10 is cleared;

[0091] 4) Set the high-precision plunger pump 10 to t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an adsorption and desorption / exploitation simulated experimental device and method of shale gas. The device comprises a reference cylinder, a sample cylinder, a constant-temperature box, a piston type middle container, a valve, a high-precision plunger pump, a data acquisition system, a valve, a pressure sensor and a pressure sensor. A constant-pressure exploitation method comprises the following steps: carrying out experiment pre-treatment; setting the high-precision plunger pump into a constant pressure mode, setting pump pressure as an experimental pressure value, and acquiring data of the high-precision plunger pump in real time during withdrawal of the pump; recording the pressure P' when a pressure value of the sample cylinder reaches the experimental pressure value set in the pump and both of the pressure values are balanced; carrying out a plurality of pressure point balancing tests. A constant-yield exploitation method comprises the following steps: carrying out experiment pre-treatment; setting the high-precision plunger pump into a constant current mode, setting gas-production experiment flow velocity in the pump, and acquiring the pressure P' of the sample cylinder and the data of the pump in real time; stopping the operation of the pump when the pressure of the sample cylinder is reduced to an experimental setting value; carrying out a plurality of gas-production flow velocity simulated tests. According to the device and the method, the reliability of the result of the exploitation simulated test is ensured.

Description

technical field [0001] The invention relates to the field of natural gas exploitation, more specifically, to a shale gas reservoir adsorption / desorption / exploitation simulation experiment device and method thereof. Background technique [0002] At present, the exploration and development of shale gas in my country is in its infancy. Laboratory experiments are mostly based on petrological analysis, geochemical analysis, and gas-bearing analysis. Development physical simulation research focuses on the determination of physical parameters, pore structure characteristics, adsorption experiments, and seepage. However, there are few studies on the simulated development mechanism of shale gas reservoirs and the simulation of production dynamics under different working systems. Patent document CN103994960A discloses a coal / shale isothermal adsorption experiment method, and proposes a new measurement method for isothermal adsorption experiments, which can effectively reduce the number...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01N7/04G01N7/16G01N33/24
CPCG01N7/04G01N7/16G01N33/24
Inventor 赵春鹏伦增珉吕成远王海涛潘伟义赵清民刘玄李宏伟郎东江周霞
Owner CHINA PETROLEUM & CHEM CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products