Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Danger monitoring and prewarning method and device

A technology of danger and monitoring information, applied in the direction of alarms, instruments, etc., can solve the problems of delay in early warning notification, failure to notify construction personnel in time of early warning information, and labor costs, so as to reduce labor costs, reduce the incidence of danger, and protect lives. safe effect

Inactive Publication Date: 2017-09-26
HEZHOU UNIV
View PDF7 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Video surveillance also requires staff to monitor the images collected by the video surveillance equipment, and notify the construction workers when potential safety hazards are detected. This method also requires labor costs, and there is a delay in the early warning notification, and the early warning information cannot be notified to the construction personnel in time.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Danger monitoring and prewarning method and device
  • Danger monitoring and prewarning method and device
  • Danger monitoring and prewarning method and device

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0042] Please refer to image 3 , image 3 It is one of the flow charts of the steps of the risk monitoring and early warning method provided by the first embodiment of the present invention. The method is applied to the server 100 that communicates with the mobile device 400 and the monitoring device 300 . The specific process of the risk monitoring and early warning method is described in detail below.

[0043] Step S120, acquiring the monitoring information collected by the monitoring device 300 at the construction site and the location information of the construction personnel carrying the mobile device 400 at the construction site.

[0044] In this embodiment, the monitoring device 300 monitors the construction operation process in real time, and sends the collected monitoring information to the server 100 . The mobile device 400 is provided with a GPS positioning device, which can report the location information of the mobile device 400 to the server 100 in real time,...

no. 2 example

[0094] Please refer to Figure 11 , Figure 11 It is a functional block diagram of the danger monitoring and early warning device 200 provided in the second embodiment of the present invention. The danger monitoring and early warning device 200 is applied to the server 100 that communicates with the mobile device 400 and the monitoring device 300 . The device includes: an acquisition module 220 , a detection module 230 and an early warning processing module 240 .

[0095] The obtaining module 220 is configured to obtain the monitoring information collected by the monitoring device 300 at the construction site and the location information of the construction personnel carrying the mobile device 400 at the construction site.

[0096] In this embodiment, the acquisition module 220 is used to execute image 3 In step S120, for the specific description of the acquisition module 220, please refer to image 3 The description of step S120 in.

[0097] The detection module 230 is ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a danger monitoring and prewarning method and device. The method is applied to a server connected with mobile equipment and monitoring equipment in a communicating manner. The method comprises the following steps: acquiring monitoring information collected by monitoring equipment on a construction site and position information of construction personnel carrying the mobile equipment on the construction site; detecting the monitoring information and the position information according to a pre-built construction information model, and judging a working condition according to a detection result; when the working condition is judged to be dangerous, performing prewarning and informing, and sending a processing scheme. Therefore, a construction process can be monitored in real time; when a danger is detected, prewarning information and a processing method can be automatically generated and informed to the construction personnel on the construction site in time, so as to guarantee the safety of the construction personnel, reduce the danger incidence rate and lower the labor cost.

Description

technical field [0001] The invention relates to the technical field of construction safety operations, in particular to a method and device for risk monitoring and early warning. Background technique [0002] During construction operations, there are many dangers. For example, there are potential safety hazards caused by improper operation of construction personnel; there are dangerous areas on the construction site, and construction personnel are not allowed to enter these dangerous areas to prevent the life and health of construction personnel from being affected. Therefore, it is necessary to monitor the on-site construction operation process, and give an early warning notification when there is a potential safety hazard in the monitoring. [0003] In the prior art, commonly used monitoring methods include manual monitoring or video monitoring. The manual monitoring method is to set up a warning line near the dangerous area and conduct on-site monitoring by a special per...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G08B27/00G08B21/02
CPCG08B21/02G08B27/00
Inventor 张金团蔡德所于冬升胡琴
Owner HEZHOU UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products