Warm-mixing SBS (styrene-butadiene-styrene) modified asphalt mixture and preparation method thereof
A technology of modified asphalt and mixture, which is applied in the direction of climate sustainability, sustainable waste treatment, solid waste management, etc., and can solve the problems affecting the health of construction workers, unfavorable compaction of SBS asphalt mixture, and SBS asphalt mixing Quick cooling of materials and other problems, to achieve the effect of convenient storage production, wide application range and prolonging the construction season
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0031] The present invention also provides a kind of preparation method of warm mix SBS modified asphalt mixture, comprises the following steps:
[0032] a. Heat the aggregate to 140°C-150°C and dry it, then add it to the mixing pot, keep the temperature in the stirring pot at 135°C-145°C, put the aggregate into the mixing pot and pre-mix for 30s;
[0033] b. Heat SBS modified asphalt to 155°C-170°C and add it to the mixing pot, add organic warm mixing agent, and stir in the mixing pot for 80s-100s;
[0034] c. Add mineral powder into the mixing pot and stir for 80s-100s;
[0035] d. Take the stirred mixture out of the pot at 120°C-145°C, and shape it at 115°C-140°C.
[0036] Wherein, in step c, the mixing time of the mineral powder is 90s.
Embodiment 1
[0042] Take 10600g of aggregate and heat it to 140°C for drying, add it to the mixing pot for pre-mixing for 30s, keep the temperature in the mixing pot at 135°C, take 498g of SBS modified asphalt and heat it to 166°C and add it to the mixing pot without adding EC-120 Warm mixing agent, stir in the mixing pot for 80s, add 212g of ore powder into the mixing pot, stir for 100s, take the mixed material out of the pot at 132°C, and shape it at 115°C to obtain warm-mix SBS modified permanent asphalt mixture.
Embodiment 2
[0044] Take 10680g of aggregate and heat it to 145°C for drying, add it to the mixing pot for pre-mixing for 30s, keep the temperature in the mixing pot at 129°C, take 502g of SBS modified asphalt and heat it to 161°C and add it to the mixing pot, put 10.0g of warm Sprinkle the agent on the surface of SBS modified asphalt, stir in the mixing pot for 89s, add 214g mineral powder into the mixing pot, and stir for 91s, take the mixed material out of the pot at 129°C, and shape it at 118°C. That is, warm mix SBS modified asphalt mixture is obtained.
PUM
Property | Measurement | Unit |
---|---|---|
melting point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com