Method for predicting peak vibration velocities of shallow-buried tunnel blasting construction surface particles
A technology of shallow buried tunnel and prediction method, which is applied in tunnels, earthwork drilling, instruments, etc., can solve problems such as the properties of explosives and rock properties that cannot be considered
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0093] During the construction of shallow-buried large-section tunnels, the CRD construction method is mostly used, so the present invention takes the CRD construction method as an example. During the CRD construction process, the entire excavation and blasting is divided into four parts. When the tunnel is blasted in the upper left pilot pit and the upper right pilot pit, the impact on the existing structures is much greater than that of the lower left pilot pit and the lower right pilot pit, so the monitoring of the upper left pilot pit and the upper right pilot pit is mainly used; the specific implementation Proceed as follows:
[0094] (1) According to the test blasting, set the upper and lower limit parameters of the blasting vibration test. In this embodiment, before the test, the maximum vibration velocity of the tunnel blasting was obtained through field trial blasting to be 8 cm / s. In order to ensure that the signal is effectively collected and avoid false triggerin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com