Process for constructing water and electricity in ceiling
A construction technology and smallpox technology, applied in water supply equipment, cable laying equipment, indoor sanitary pipeline installations, etc., can solve problems that are easy to harm others, difficult to maintain, difficult to find the location of the problem, etc., to reduce losses, The effect of easy maintenance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0045] A hydroelectric ceiling construction process, comprising the following steps:
[0046] 1) Electrical construction
[0047] The first step, the electrician cuts the groove
[0048] A1, draw the construction line and potential line according to the determined location of various electrical appliances and the direction of the wiring;
[0049] A2, tangent slots or bottom box slots, use a cutting machine to cut according to the construction line and potential line; when encountering steel bars, smash and bend the steel bars; cut out horizontal and vertical line slots or square and straight bottom box slots; The difference between the depth of the trunking and the diameter of the external water pipe is greater than 10mm, and the difference between the depth of the bottom box groove and the thickness of the bottom box is greater than 10mm;
[0050] A3, after tangent slot or bottom box slot, slot with hammer or awl; when slotting, do not go through the wall;
[0051] A4, cle...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com