Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Method for repairing inner wall of acid-making absorption tower

A repair method and acid absorption tower technology, applied in separation methods, chemical instruments and methods, sulfur compounds, etc., can solve problems such as blockage of sulfuric acid pumps and sulfuric acid coolers, affecting the production stability of the acid system, and increasing pipeline maintenance costs, etc. , to achieve the effects of improving stability, eliminating personal injury accidents, reducing spare parts consumption and maintenance costs

Active Publication Date: 2017-05-24
ANGANG STEEL CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the long-term operation of the absorption tower, the lead-lined layer is prone to bulging and leakage. The acid mud formed after the lead-lined layer is corroded by sulfuric acid flows back into the absorption tower, causing a series of problems such as blockage of the sulfuric acid pump and sulfuric acid cooler. , not only increases the cost of pipeline maintenance, directly affects the stability of the acid production system, but also easily causes personal injury accidents

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for repairing inner wall of acid-making absorption tower

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] Depend on figure 1 It can be seen that the upper tower body 1 of the absorption tower includes the outer tower wall steel plate 5 and the lead-lined layer 2 and the brick-lined layer 3 of the inner lining.

[0017] The concrete method and steps of repairing the inner wall of the acid absorption tower of the present invention are:

[0018] 1. Remove the upper connecting pipe of the absorption tower, hang the upper body 1 head of the absorption tower with a crane and stabilize it, then remove the fasteners at the flange connection part, and then use a crane to lift the upper body 1 head of the absorption tower Lift it up and put it on the ground.

[0019] 2. Use a portable cutter or blade to cut out the manhole 1.65m down from the upper body 1 of the absorption tower, separate the lead-lined layer 2 from the steel plate 5 on the tower wall, and use a stone pencil to clean the lead-lined layer 2 and the steel plate on the tower wall. 5. Mark the line, then hang the upper...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for preparing an inner wall of an acid-making absorption tower. After an upper head of the absorption tower of which an upper connection pipeline is removed is hung and stabilized, a flange connecting piece is disassembled; and after the flange connecting piece is disassembled, an upper tower body is hung onto the ground. A man hole is cut out at a downward position of the upper tower body in a range of 1.65 to 1.7m, a lead lining layer is separated from a tower wall steel plate, a slate pencil is used for marking, a marked part is cut apart by gas welding and the upper tower body is hung onto the ground. The lead lining layer at the repaired position is cut off, and then a tower wall steel plate is ground and processed by hydrochloric acid. The tower wall steel plate is subjected to lead patching by a lead bar, a thickness of carrying out lead patching for the first time is 2.5 to 3.6mm, and a thickness of carrying out lead patching for the second time is 1.5 to 2.5mm. The man hole is enveloped with a lead plate with a thickness of 4.5 to 5.5mm, and a joint is completely full-welded; then leakage testing is carried out by hydrochloric acid until no leakage point is generated and the acid-making absorption tower is qualified. According to the method provided by the invention, the problem of internal leakage of the absorption tower can be effectively solved, blockage of a sulphuric acid pump and a sulfuric acid cooler is avoided, the service life of an acid-making pipeline is prolonged, repair cost is reduced, a personal injury accident caused by acid leakage is avoided, and stability of production of an acid-making system is improved.

Description

technical field [0001] The invention belongs to the technical field of coking equipment, and in particular relates to a method for repairing the inner wall of an absorption tower in a desulfurization and acid production process. Background technique [0002] The absorption tower is an important equipment for the desulfurization and acid production process in the coke oven gas purification process. It is divided into two parts: the upper tower body and the lower tower body. The outermost layer of the lower part of the absorption tower is a steel plate tower wall, the inner wall of the steel plate tower wall is provided with a lead lining layer, and the lower section is also built with a brick lining layer between the inner wall of the tower wall and the lead lining layer. During the long-term operation of the absorption tower, the lead-lined layer is prone to bulging and leakage. The acid mud formed after the lead-lined layer is corroded by sulfuric acid flows back into the a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): B01D53/18C01B17/76
CPCB01D53/18C01B17/806
Inventor 马银华武斌
Owner ANGANG STEEL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products