A method and device for automatically generating an adjustment scheme for a baseband processing board of a base station
A baseband processing board, an automatic generation technology, applied in wireless communication, electrical components, etc., can solve the problems of not considering the adjustment of the actual physical location of the base station, not considering the mobility of the mobile communication network, and the long time for generating the solution, so as to improve the wireless resources. utilization, alleviating network congestion, and improving user perception
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0074] Assuming that the carrier capacity actually supported by base station B is N, and the peak number of carriers required by the base station is M, if base station B is a candidate expansion base station, the supplementary algorithm for its baseband processing board is:
[0075] If M-N≤9, a UPBI board will be given priority;
[0076] If 9
[0077] If M-N>12, the optimal value of the combination of the two boards will be added first according to the carrier value to be expanded. For example: if M-N=18, two UPBIs will be added first; if M-N=21, one UPBM and one UPBI board will be added first ; If M-N=24, then supplement two UPBM boards first, and so on in other cases.
example 2
[0079] Assuming that base station C is equipped with UPBI board and / or UPBM board, if base station C is an alternative capacity reduction base station, the detachable algorithm of its baseband processing board is:
[0080] If base station C is equipped with one UPBM board and one UPBI board, and the peak number of carriers required by base station C is 10, then one UPBI board can be removed;
[0081] If base station C is configured with two UPBM boards, and the peak number of carriers required by base station C is 21, no board can be removed.
[0082] If base station C is configured with one UPBM board and two UPBI boards, and the peak number of carriers required by base station C is 10, then two UPBI boards can be removed.
[0083] If base station C is configured with one UPBM board and two UPBI boards, the peak number of carriers required by base station C is 19, and one UPBI board is detachable on the side.
[0084] If base station C is configured with one UPBM board and t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com