Resource distribution method and device
A technology of resource allocation and network side equipment, which is applied in the field of resource allocation and can solve problems such as the inability to realize the scheduling of data packet priorities
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0131] Embodiment 1: The first correspondence relationship between PPP and LCG ID is configured by broadcasting.
[0132] Step 1: The base station configures the first corresponding relationship between PPP and LCG ID by broadcasting.
[0133] If the number of LCG IDs is consistent with the number of PPP levels, the base station may use a 1:1 mapping manner when configuring the correspondence between PPP and LCG IDs.
[0134] If the number of LCG IDs is less than the number of PPP levels, m:1 (m≥1) mapping needs to be considered. An example is as follows: If the number of PPP levels is 8 and the number of LCG IDs is 4, then the mapping can be performed according to 2:1, as shown in Table 1:
[0135] PPP level LCG ID 1 / 2 00 3 / 4 01 5 / 6 10 7 / 8 11
[0136] Table 1
[0137]The base station in the embodiment of the present invention puts the first correspondence in the SIB and sends it by broadcast.
[0138] In order to support the base statio...
Embodiment 2
[0155] Embodiment 2: The corresponding relationship between PPP and LCG ID is configured through dedicated signaling.
[0156] Step 1: The base station configures the corresponding relationship between PPP and LCG ID through dedicated signaling
[0157] When the base station configures the first correspondence between the PPP and the LCG ID through dedicated signaling, the first correspondence may be the same or different for different terminals. The first correspondences corresponding to different destination addresses of the same terminal may be the same or different.
[0158] If they are the same, the base station can directly determine the first correspondence between the PPP and the LCG ID. For example, if the number of LCG IDs is consistent with the number of PPP levels, the base station may use a 1:1 mapping manner when configuring the first correspondence between PPP and LCG IDs.
[0159] However, if the number of PPP levels is greater than the number of LCG IDs, m:1...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com