A kind of rail-changing train operation method
A technology for trains and rails, which is applied in the direction of track, track laying, track maintenance, etc. It can solve problems such as rail invasion, hidden dangers of train operation safety, long rail movement, etc., to reduce stress, save time for unloading new rails, and make reasonable adjustments Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] As attached figure 1 And figure 2 As shown, a specific embodiment of the rail-changing train 1 to which the method of the present invention is applied, the rail-changing train 1 includes: a replacement module 3, a loading and unloading module 4, and a transportation module 5 that are sequentially connected along the construction operation direction. The operating direction of the rail change train 1 when replacing the new rail 6 is as attached figure 1 As indicated by the middle arrow L1, the operating direction of the rail-changing train 1 when recycling the old rail 10 is as attached figure 2 As shown by the middle arrow L2. among them:
[0046] The transport module 5 loads and transports the new rail 6.
[0047] The loading and unloading module 4 is provided with a rail transfer device 7, and the rail transfer device 7 transfers the new rail 6 to the replacement module 3.
[0048] A rail splitting device 8 is provided on the loading and unloading module 4, and the rail s...
Embodiment 2
[0065] In this embodiment, the rail-changing train 1 also includes a rail-welding module 2 connected to the replacement module 3 and capable of independent operation for welding new rails 6 adjacent to each other on the line. The rail-welding module 2 has self-propelled power. . When the rail-changing train 1 reaches the starting point of construction within the skylight time, the rail welding module 2 is unlocked and decoupled from the rail-changing train 1. After the replacement module 3 unloads the transferred new rail 6 into the sink rail groove of the sleeper, the rail welding module 2 welds the new rails 6 adjacent to each other on the line.
[0066] As attached Figure 5 As shown, a specific embodiment of a construction operation method based on the rail-changing train 1. The rail-changing train 1 includes: a rail welding module 2, a replacement module 3, a loading and unloading module 4, and a transportation module 5 connected in sequence along the construction operation ...
Embodiment 3
[0075] In this embodiment, the rail-changing train 1 also includes a disassembly module 11 connected between the replacement module 3 and the loading and unloading module 4. When the rail splitting device 8 adjusts the delivered new rail 6 to an appropriate distance, the disassembly module 11 will Remove the remaining fasteners on the line.
[0076] As attached Image 6 As shown, a specific embodiment of a construction operation method based on the rail-changing train 1. The rail-changing train 1 includes: a replacement module 3, a disassembly module 11, a loading and unloading module 4, and a transportation module 5 that are sequentially connected along the construction operation direction. The rail train operation method includes the following steps:
[0077] S11: After the rail fasteners are disassembled according to the tight 1 loose 8 pattern, the rail-changing train 1 arrives at the starting point of construction within the skylight time, and the new rail 6 is loaded and tra...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com