Operating method of rail exchanging train
A technology for trains and rails, which is applied in the direction of track, track laying, track maintenance, etc. It can solve problems such as rail invasion, hidden dangers of train operation safety, long rail movement, etc., to reduce stress, save time for unloading new rails, and make reasonable adjustments Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] as attached figure 1 And attached figure 2 As shown, a specific embodiment of the rail-changing train 1 applied by the method of the present invention, the rail-changing train 1 includes: a replacement module 3 , a loading and unloading module 4 and a transport module 5 sequentially connected along the direction of construction work. When changing the new rail 6, the operation direction of the track changing train 1 is as attached figure 1 Shown in middle arrow L1, the working direction of track changing train 1 when reclaiming old rail 10 is as attached figure 2 Indicated by the middle arrow L2. in:
[0046] The transport module 5 loads and transports the new rail 6 .
[0047] The loading and unloading module 4 is provided with a rail transfer device 7 , and the rail transfer device 7 transfers the new rail 6 to the replacement module 3 .
[0048] The loading and unloading module 4 is provided with a rail splitting device 8, and the rail splitting device 8 adjus...
Embodiment 2
[0065] In this embodiment, the rail-changing train 1 also includes a rail-welding module 2 connected to the replacement module 3 and capable of operating independently for welding the adjacent new rails 6 on the line. The rail-welding module 2 has self-propelled power . When the rail-changing train 1 reaches the construction starting point within the skylight time, the rail-welding module 2 is unlocked and decoupled from the rail-changing train 1. After the replacement module 3 unloads the new rail 6 delivered into the sinker groove of the sleeper, the rail welding module 2 welds the new rails 6 adjacent to each other on the line.
[0066] as attached Figure 5 As shown, a specific embodiment of the construction operation method based on the rail-changing train 1, the rail-changing train 1 includes: a welding rail module 2, a replacement module 3, a loading and unloading module 4 and a transport module 5 connected in sequence along the construction operation direction, The t...
Embodiment 3
[0075] In this embodiment, the track-changing train 1 also includes a dismantling module 11 connected between the replacement module 3 and the loading and unloading module 4. After the rail dividing device 8 adjusts the new rails 6 delivered to a suitable distance, the dismantling module 11 will The remaining fasteners on the line are removed.
[0076] as attached Image 6 As shown, a specific embodiment of the construction operation method based on the rail-changing train 1, the rail-changing train 1 includes: a replacement module 3, a dismantling module 11, a loading and unloading module 4 and a transport module 5 that are sequentially connected along the direction of construction work. Rail train operation method comprises the steps:
[0077] S11: After the rail fasteners are disassembled according to the mode of tightening 1 loosening 8, the rail change train 1 arrives at the construction starting point within the skylight time, and the new rail 6 is loaded and transporte...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com