Collapsible loess deep presoaked water dynamic compaction method
A technology of collapsible loess and pre-soaking water, applied in soil protection, construction, infrastructure engineering, etc., can solve the problems of long processing period and high processing cost, and achieve the effect of shortened construction period, reduced cost and broad application prospect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0045] In order to make the purpose of the invention, technical solutions and beneficial effects of the present invention clearer, the embodiments of the present invention will be described below in conjunction with the accompanying drawings. The features in can be combined arbitrarily with each other.
[0046] The core idea of the present invention is to solve the problem of processing the newly formed deep collapsible loess site or foundation of "digging mountains and filling valleys" encountered in a large number at present. According to the site building layout and use requirements, combined with the respective characteristics and advantages of pre-soaking water method and dynamic compaction method, which are common treatment methods for collapsible loess foundations, a set of comprehensive treatment technologies for deep collapsible loess sites or foundations has been formed by combining strengths and avoiding weaknesses. , effectively solve the problem of coordinated c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com