A composite welding, medium-high carbon technology, applied in welding equipment, metal processing equipment, manufacturing tools, etc., can solve the problems of unsuitable for large-scale welding operations and expensive welding materials, so as to reduce processing workload, improve quality, The effect of reducing production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] The steel type is 45# steel.
[0018] 1. Preheat the vacuum chamber and billet to make the billet temperature reach 300°C.
[0019] 2. The set welding speed of the vacuum composite welding torch is adjusted from 6m / s to 8m / s, and the set welding current is adjusted from 400ma to 350ma.
[0020] 3. Before formal welding, a short side with a length of 1.9 meters of the length of the end face of the slab is welded in parallel at 50mm below the pre-welded weld at the end of the slab.
[0021] 4. After welding the two ends and one side, wait for 2 hours for the other side before welding.
[0022] 5. After the other side is welded, a long side with a length of 4 meters of the length of the slab side is welded parallel to the side at its lower 50 mm.
[0023] 6. After the composite slab is welded, continue to place it in the sealed welding room for 12 hours.
Embodiment 2
[0025] The steel type is AGMJ45 steel.
[0026] 1. Preheat the vacuum chamber and billet to make the billet temperature reach 310°C.
[0027] 2. The set welding speed of the vacuum composite welding torch is adjusted from 6m / s to 7.9m / s, and the set welding current is adjusted from 400ma to 340ma.
[0028] 3. Before formal welding, a short side with a length of 2.2 meters of the length of the end face of the slab is welded in parallel at 49mm below the pre-welded weld at the end of the slab.
[0029] 4. After welding the two ends and one edge, wait for 2.1 hours for the other edge before welding.
[0030] 5. After the other side is welded, a long side with a length of 3.6 meters of the length of the slab side is welded parallel to the side at its lower 52 mm.
[0031] 6. After the composite slab is welded, it should be placed in the sealed welding room for 14 hours.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com