A Method of Connecting Pile Legs Using 3000t Floating Crane
A technology of pile legs and floating cranes, applied in the directions of load hanging components, transportation and packaging, can solve the problems of increased cost and operation risk, and the pile legs are closed in sections, so as to shorten the construction period, reduce the period of closing, Guaranteed build quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] In order to deepen the understanding of the present invention, the present invention will be further described in detail below. This embodiment is only used to explain the present invention, and does not constitute a limitation to the protection scope of the present invention.
[0023] A kind of method that utilizes 3000t floating crane of the present invention to carry out pile leg pile connection, such as figure 1 As shown, 6 special 100t lifting lugs 2 are welded on the top of the upper section of the pile leg section 1 in advance, and the distance from the top is about 10m, which is reserved for the adjustment of the floating hook 3 in the height direction when positioning the pile. margin.
[0024] Such as figure 2 As shown, before hoisting the total section 1 of pile legs, prepare these spreaders in advance: 200t Dyneema high-strength ring sling 4, a single length of 10m, a total of 3 pieces; 100t Dyneema high-strength ring sling 5, a single length 6m, 3 in tot...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com