Device and method for verifying insulation monitoring accuracy and leakage protection of battery pack management system
A management system and insulation monitoring technology, applied in the direction of measuring devices, measuring electricity, measuring electrical variables, etc., can solve the problem that there is no unified insulation monitoring accuracy error range, and there is no verification of the battery management system accuracy. , There is no specific requirements and inspection methods to achieve the effect of verification accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] like figure 2 As shown, a device for verifying the insulation monitoring accuracy and leakage protection of the battery pack management system is used to verify the insulation monitoring accuracy of the battery pack 1 detected by the battery pack management system, and then evaluate its leakage protection, including the first single-throw switch K1 , the first single-throw switch K2, the double-throw switch K3, the rheostat box 2, the ammeter 3 and the insurance 4;
[0038] The connection mode of the circuit is that the rheostat box 2, the ammeter 3 and the insurance 4 are connected in series. Specifically, one end of the rheostat box 2 is connected in series with the ammeter 3 and the other end is connected to the moving end c of the double-throw switch K3; the first fixed end a of the double-throw switch K3 The positive pole of the battery pack 1 is connected to the first wire harness 5 through the first single-throw switch K1 in turn; the second fixed end b of the d...
Embodiment 2
[0045] A method for verifying the insulation monitoring accuracy and leakage protection of a battery pack management system, the steps comprising:
[0046] Step 1, connect the circuit according to the content described in Embodiment 1, and ensure that the circuit connection is intact and there is no disconnection phenomenon;
[0047] The concrete method of described step 1 comprises:
[0048] Take a multimeter, adjust it to the resistance level, clamp the positive and negative needles of the multimeter to the first wire harness 5 and the third wire harness 7 respectively, close the first single-throw switch K1, and close the double-throw switch K3 to the first non-moving end a; compare Whether the value displayed on the multimeter is consistent with the resistance adjusted by the rheostat box 2, if the multimeter has no display, it means that the circuit is broken, and the circuit needs to be checked and reconnected;
[0049] Then clamp the positive and negative hands of the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com