A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units
A peak-shaving unit and demand-response technology, applied in the field of power system, can solve problems such as fluctuation of dispatching capacity, overestimation of demand-response resources, and strong uncertainty of demand-response resources.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0083] The present invention will be further described below in conjunction with the accompanying drawings.
[0084] A method for constructing a demand response dispatch evaluation system for simulating peak-shaving units, comprising the following steps:
[0085] Step 1: Determine the evaluation time of demand response scheduling, that is, the total time of ideal peak shaving;
[0086] Let the response time be 2 hours, let 5min be a time period, set 1Δt=5min, and respond at the starting time T s , the response end time T f , that is, the response scheduling evaluation time T f -T s = 24Δt;
[0087] Assume Then the first response period is The second response period is And so on, the 24th response period is
[0088] Step 2: Aiming at the simulated peak-shaving unit, construct a three-level demand response scheduling evaluation system for the simulated peak-shaving unit from the time dimension, capacity dimension and object dimension: the first level is the overall ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com