A Timing Budget Method Considering Distance and Clock
A timing and clock technology, applied in the field of hierarchical physical design, can solve problems affecting the design cycle and hindering the progress of physical design of sub-modules, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0097]The present invention will be further described in detail below in conjunction with specific embodiments and accompanying drawings.
[0098] refer to Figure 7 , is the flow chart of the timing budget method considering distance and clock for the present invention, the present invention comprises the following steps:
[0099] The first step is to determine the process node and the metal layers used. For a given process and metal layer, the repeater insertion method can make the interconnection delay linear with the length of the interconnection line. The interconnection delay α per unit length can be obtained by the following calculation method.
[0100] 1.1 Obtain the process node and the total number of metal layers M that can be used max .
[0101] 1.2 Select the first with the first The layer metal acts as the horizontal and vertical trace metal layers. in for right the rounding of for right rounding of .
[0102] 1.3 Get the first with the first ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com