[0034] The invention discloses a construction method of an integral ballast bed, which uses a short sleeper integral ballast bed, and adopts the construction method of "rail-bent-rail method". Among them, the short sleepers are manufactured by the factory, and the main construction method is: transport the short sleepers and 25m non-porous rails to the track laying construction site by car, and use the under-mounted rail support frame to set up the vertical rail row, and at the same time carry out rough track adjustment and reinforcement. For the construction of binding, formwork and other processes, after the construction of each process meets the requirements of the design technical specifications, the concrete of the track bed will be poured, see the attached figure 1 Shown is the detailed method.
[0035] The general method is as follows:
[0036] Step (1) Assembling the rail row
[0037] At the construction site, 100mm thick square wood is used as the rail assembly plat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com