On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit
A cable shell and beret technology, applied in the field of construction, can solve the problems of large space occupation, high cost, time-consuming and labor-intensive, etc., and achieve the effect of low cost, small land occupation, and construction safety protection.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] The method is carried out in eight steps. First, (1) the anchorage section of the column of the Bailey frame: firstly, the artificial excavated pile is constructed on the original ground of the foundation pit according to the coordinate position, and the artificial excavated pile with the cross section of the anchorage end of the column is φ1200mm to the bottom of the foundation pit. Merge into the 5m end hole of strong weathered rock, and then bury the Bailey frame column on the pile top; (2) Build the Bailey frame structure: bury 2 I 50b I-beams on the pile top, and erect 2 I 50b I-beam beams , 40b# I-beam main beam and 14# channel steel, 40b# I-beam main beam is connected with two I 50b I-beam beam bolts, and the Bailey frame main beam, Bailey frame secondary beam, and Bailey frame purlins are erected. The main girder of the Bailey frame is two I50b I-beams horizontally erected on the top of the column of the Bailey frame, and the secondary beam of the Bailey frame is...
Embodiment 2
[0023] Repeat embodiment 1 by the same steps as described, the difference is: step (1) Bailey frame column anchor section: merge into the middle weathered rock 3m end hole, then bury the Bailey frame column at the pile top, step (2) ) to erect the Bailey frame structure: the Bailey frame beam is two 40b# I-beams, the beam top elevation is -0.17m, the distance between the two I-beams is 3m, and the span is 9m.
Embodiment 3
[0025] Repeat embodiment 1 by the same steps as described, the difference is: step (1) Bailey frame column anchorage section: merge into the micro-weathered rock 2m end hole, then bury the Bailey frame column at the top of the pile, step (2) ) to erect the Bailey frame structure: the Bailey frame beam is two 40b# I-beams, the beam top elevation is -0.17m, the distance between the two I-beams is 4m, and the span is 10m.
PUM
![No PUM](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/noPUMSmall.5c5f49c7.png)
Abstract
Description
Claims
Application Information
![application no application](https://static-eureka-patsnap-com.libproxy1.nus.edu.sg/ssr/23.2.0/_nuxt/application.06fe782c.png)
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com