Method of Monitoring Horizontal Displacement of Top of Foundation Pit
A technology of horizontal displacement and foundation pit, which is used in excavation, infrastructure engineering, and on-site foundation soil survey, etc. It can solve the problems of high professional skills requirements, high measurement costs, and high site requirements for monitoring personnel.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] Below in conjunction with specific embodiment and accompanying drawing ( figure 1 , 2 , 3), the essence of the present invention is further elaborated.
[0045]1) Monitor the horizontal displacement of the top of the longitudinal two long sides
[0046] Such as figure 1 As shown, the horizontal displacement monitoring point B is set in sequence on the two long opposite sides of the long strip foundation pit 1 、B 2 、B 3 ..., C 2 、C 3 ..., where B 1 is the corner point of the foundation pit, and the distance between the two monitoring points is monitored regularly. measured in B 1 Point B is used as a reference fixed point. During the whole excavation process, the fixed point B 1 The displacement is 0.
[0047] When asking for B 2 、C 2 For the absolute displacement of the two points, first use the rangefinder to measure B before excavation of the foundation pit 1 to B 2 , B 2 to C 2 After the excavation of the foundation pit, the rangefinder is used regul...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com