Cultivation method of seedlings of limonium gmelinii of saline-alkali soil in arid region
A technology of Limonium macrophylla and its cultivation method, which is applied in the field of seedling cultivation of the halophyte Limonium macrophylla in arid areas in saline-alkali land, can solve the problems such as the decrease of seed germination rate, achieve control inhibition, control the scattered distribution of seedlings, and reduce irrigation The effect of water consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Example 1 (Fukang Desert Ecological Station, Chinese Academy of Sciences)
[0020] a. Site selection and site preparation:
[0021] Select a flat plot with a salt content of 1.5% in the 0-20cm soil layer, and plow and harrow to ensure that the sowing soil is finely divided and flat;
[0022] b. Structural ridge topography:
[0023] Ditch and ridge in a parallel direction, the distance between the bottom of the ditch is 0.6m, the depth is 0.2m, and the width of the ridge is 0.2m. The ridge slope is smoothed, and the terrain of the ridge is constructed. The furrow is 5.0m long and 3.0m wide, and the soil ridge around the furrow should be high. On the furrow surface;
[0024] c. Irrigation management:
[0025] Before planting, the head water treatment is carried out, and the head water is treated with flood irrigation in the border. The water in the border should overflow the ridge surface. The water in the head water disappears completely 3 days after the second irriga...
Embodiment 2
[0028] Example 2 (Xiaguai Township, Karamay)
[0029] a. Site selection and site preparation:
[0030] Choose a flat plot with a salt content of 2.0% in the 0-20cm soil layer, and plow and harrow to ensure that the sowing soil is finely divided and flat;
[0031] b. Structural ridge topography:
[0032] Ditch and ridge in a parallel direction, the distance between the bottom of the ditch is 0.6m, the depth is 0.3m, and the width of the ridge is 0.3m. The ridge slope is smoothed, and the terrain of the ridge is constructed. The furrow is 5.0m long and 3.0m wide, and the soil ridge around the furrow should be high. On the furrow surface;
[0033] c. Irrigation management:
[0034] Before sowing, the head water treatment is carried out, and the head water is treated with flood irrigation in the furrow. The water in the furrow should overflow the ridge surface. The water in the head water will be watered for the second time 5 days after the water disappears completely. Keep th...
Embodiment 3
[0037] Example 3 (Caramay Carbon Sink Forest Base)
[0038] a. Site selection and site preparation:
[0039] Select a flat plot with a salt content of 2.5% in the 0-20cm soil layer, and plow and harrow to ensure that the sowing soil is finely divided and flat;
[0040] b. Structural ridge topography:
[0041] Ditch and ridge in a parallel direction, the distance between the bottom of the ditch is 0.6m, the depth is 0.2m, the width of the ridge is 0.3m, and the slope of the ridge is smoothed, and the terrain of the ridge is constructed. The furrow is 5.0m long and 3.0m wide. On the furrow surface;
[0042] c. Irrigation management:
[0043] Before sowing, the head water treatment is carried out, and the head water is treated by flood irrigation in the border. Keep the soil in the ditch moist at a degree across the sowing line, and after the Limonium hemophilus emerges, regularly irrigate to keep the soil in the ditch moist;
[0044] d. Sowing:
[0045] On May 27, 2014, af...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com