Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Train test platform

A test platform and train technology, applied in vehicle testing, testing/monitoring control systems, testing of machine/structural components, etc., can solve problems such as lack of simulation, cumbersome components, and complex problems

Inactive Publication Date: 2015-02-18
BOMBARDIER TRANSPORTATION GMBH +1
View PDF6 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, simulating all other components that may affect the UUT is in some ways tedious and time-consuming, and also error-prone
Unintended influences and disturbances are often not detected due to lack of simulation of components that do not usually "mimic" unintended behavior
The problem becomes more complex when testing not only a group of components of a single vehicle, but also a multi-car unit similar to a railroad train

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Train test platform
  • Train test platform
  • Train test platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0072] figure 1 An overview of a multi-car railway train test platform 101 is shown. The test platform 101 is suitable for a train comprising eight cars. The test platform 101 thus consists of eight car units 111 to 118 . Reference numerals 1 to 8 represent each respective car train system comprised by a production train car represented by a respective car unit 111 to 118 . For example, the symbol 1 of the car unit 111 represents all or at least a majority of the most important operational train components and safety-related functional train components associated with the first car of the production train. For example, in other car train systems, this first car also includes the driver's station, braking system, door system, heating ventilation air conditioning system (HVAC), train control and management system (TCMS) components, just to name a few example. Those components included in the integration tests to be performed by the test platform 101 are denoted by the symbol...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A train test platform (101) for integration testing of actual train components of a multiple car railway train and a method to test such actual train components ahead of production of the first actual real train or without the need of an actual complete train is provided. The test platform (101) comprises a supervisor unit (119) and several car units (111 to 118) linked by a reflective memory system (137). The actual components to be tested are installed in instrumentation units of the respective car units (111 to 118). The instrumentation units provide break-out interfaces for connecting the actual train components to a train communication system (136) comprising the wiring, bus systems, power supplies etc. that are functionally identical to the communication system (136) in the actual train. Further the instrumentation units simulate those components not being present physically in the respective cars to provide the signals produced by theses components and to react on signals designated for these components. Testing is performed by monitoring and or manipulating signals at the break-out interfaces in real-time. All testing is controlled by the supervisor unit (119) using the reflective memory to exchange information with the platform components in the respective car units (111 to 118).

Description

technical field [0001] The invention relates to a train testing platform, especially for the integrated testing of electrical, electromechanical and / or electro-pneumatic train systems and components. Background technique [0002] The complexity of modern rail trains has increased dramatically over the past few decades. Many systems and components today are controlled and interconnected by communication systems including wires and buses. In trains that include multiple cars, it is important to test the individual train systems and components not only for their functionality as individual systems, but also for their functionality as components of an interconnected integrated train system. [0003] To date, test stations or test platforms for the independent testing of individual train systems have generally been set up. US 6,269,319 B1 also discloses a reconfigurable integrated test station for multiple vehicle components of a single vehicle (eg aircraft). Test stations are...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/00
CPCG01R31/008G06F30/15G01M17/007G05B23/00
Inventor F·布古安L·科尔代勒T·吉林R·基希霍夫A·埃克马克D·京特D·沙尔坦X·贝尔热G·托拉多
Owner BOMBARDIER TRANSPORTATION GMBH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products