Desert area sand stabilizing and vegetation planting structure
A regional and desert technology, applied in planting substrates, botanical equipment and methods, horticulture, etc., can solve problems such as short effective time, high cost, and large sandstorms
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] refer to figure 1 , The sand-fixing and planting structure in the desert area provided by this embodiment mainly includes three structural layers: a solidification layer 4 , a water and fertilizer retention layer 3 and a porous growth layer 2 .
[0028] In this embodiment, hemihydrate gypsum is used as the sand-fixing agent. First, the sand-fixing agent is sprayed onto the loose sand dune surface 5, and water is sprinkled so that the sand-fixing agent penetrates into the pores of the sand grains to form a high-strength cement and obtain a solidified layer 4. Specifically, it is also possible to first fix a sand-fixing frame on the surface of the loose sand dune, and then spray the sand-fixing agent into the sand-fixing frame. The shape of the sand-fixing frame can be cross, triangle, square or some other regular or irregular shapes.
[0029] Then clay, fertilizer, water-retaining agent and hemihydrate gypsum are mixed in a weight ratio of 3:1:1:0.1, and vegetation seed...
Embodiment 2
[0033] The difference from Example 1 is that in this example, a mixture of hemihydrate gypsum and anhydrite is used as the sand-fixing agent. Among them, in the water and fertilizer retention layer, the weight ratio of clay, fertilizer, water retention agent and sand-fixing agent is 2:1:1:0.5; in the porous growth layer 2, the weight ratio of gravel, straw fiber and sand-fixing agent is 20:1:0.5
Embodiment 3
[0035] Different from Example 1, in this example, water glass is used as the sand-fixing agent. Among them, when preparing the solidified layer, water glass is sprayed onto the surface of the loose sand dunes. At this time, the sand-fixing agent can penetrate into the pores of the sand grains without sprinkling water to form a high-strength cement; in the water and fertilizer retention layer, clay The weight ratio of fertilizer, water retaining agent and sand-fixing agent is 2.5:1:1:0.2; in the porous growth layer 2, the weight ratio of gravel, straw fiber and sand-fixing agent is 15:1:0.8.
[0036] In summary, the sand-fixing vegetation structure provided by the embodiment of the present invention has the functions of sand-fixing, water retention and fertilizer conservation. Planting vegetation in the sand-fixing vegetation structure can improve the survival rate of vegetation and achieve the purpose of shady trees.
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com