Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system

An optimization method and EMU technology, applied in computing, instrumentation, data processing applications, etc., can solve problems such as inability to take into account constraints and inability to meet advanced maintenance tasks

Inactive Publication Date: 2015-01-14
上海杰之能软件科技有限公司
View PDF4 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Under the premise that it is currently impossible to expand the maintenance site or provide sufficient equipment, how to reasonably arrange advanced maintenance tasks to maximize the use of existing maintenance sites and equipment has become a breakthrough point to solve the above contradictions
[0006] The existing high-level maintenance plan for EMUs is mainly based on the traditional manual preparation method, which cannot meet the needs of advanced maintenance tasks that are constantly changing with the EMU operation plan, and the complexity of advanced maintenance determines that the advanced maintenance plan manually compiled cannot take into account Various constraints, maximize the use of existing maintenance sites and equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system
  • Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system
  • Method for optimizing bogie procedure in advanced repair of motor train unit and planning and scheduling method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. However, the present invention can be implemented in many other ways different from those described here, and those skilled in the art can make similar extensions without violating the connotation of the present invention, so the present invention is not limited by the specific implementations disclosed below.

[0067] Secondly, the present invention is described in detail by means of schematic diagrams. When describing the embodiments of the present invention in detail, for convenience of explanation, the schematic diagrams are only examples, which should not limit the protection scope of the present invention.

[0068] Since the current regular maintenance mode adopted by EMUs is prior and planable maintenance, it is of great significance to formulate a reasonable and efficient EMU maintenance plan for orderly and efficient EMU ma...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for optimizing a bogie procedure in an advanced repair task of a motor train unit and an advanced repair planning and scheduling method and system for the motor train unit. The advanced repair planning and scheduling method for the motor train unit includes the steps of receiving a scheduling time period and an advanced repair task in the time period, determining space overhaul capacity of a motor train with the advanced repair task, determining total time and work load in a unit time in the bogie procedure in advanced repair programs corresponding to vehicle types in the advanced repair task, determining the time when the motor train unit enters a warehouse in the advanced repair task, building a mixed integer programming model of the advanced repair program of the motor train set on the basis of the scheduling time period, the advanced repair task, the total time and the work load in a unit time in the bogie procedure and the time when the motor train unit enters the warehouse, and calculating a feasible solution of an output model. The plan of the advanced repair of the motor train unit can be efficiently made, and existing overhaul spaces and equipment can be made use of to the largest extent by means of the advanced repair task of the motor train unit.

Description

technical field [0001] The invention relates to the technical field of high-speed railway construction, and in particular to a process optimization method for high-level repairing bogies of EMUs, a method and system for planning and scheduling advanced repairs for EMUs. Background technique [0002] At present, my country's high-speed railways, subways and intercity railways in major cities are all under rapid development and construction. With the continuous expansion of the operation scale of EMUs and the continuous accumulation of running kilometers, in order to ensure the rapid and efficient operation of EMUs, it is necessary to carry out maintenance of EMUs. [0003] In view of the short operating time of EMUs in my country, maintenance operations are mainly arranged according to the regular maintenance mode. Periodic maintenance According to the technical parameters such as the traveling kilometers or running time of the EMU, the EMU maintenance plan is formulated in ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/04G06Q10/06312G06Q10/06316
Inventor 冯敏刚
Owner 上海杰之能软件科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products