Intelligent electrical equipment operation management system

An intelligent management system and power equipment technology, applied in the field of power equipment management, can solve the problems of high management cost, inconvenient installation work site, and low management efficiency.

Inactive Publication Date: 2014-12-24
张藤予
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Since each power equipment in the power system needs to be installed in multiple locations according to the actual situation, and the installation and other operation points are widely distributed, it is not convenient for the management personnel to go to the installation operation site of each power equipment with the task execution personnel to assess the performance of the task execution personnel. The task execution and attendance status, usually the task executors fill in the form to confirm their attendance and work status in the implementation of power equipment installation and other work items, and the management personnel assess their attendance rate and completion of power equipment operation items through the form filled by the task executors Quality, this kind of self-attendance management of task executors cannot really and effectively supervise the execution rate and attendance rate of power equipment operations of task executors
If one-to-one strict management of the attendance and completion status of the power equipment operation project implementation work of the task executors, there will be shortcomings such as high management costs and low management efficiency.
In addition, even if the task executors attend work in accordance with the regulations, due to the lack of necessary supervision, the standardization and high level of implementation of power equipment installation, commissioning and other operational items rely entirely on the responsibility and professional quality of the task executors, lacking effective hardware specification guarantees and Standardized specification guidelines, which will make it impossible to timely feedback and statistics reflect the operation project information such as power equipment installation and commissioning status
Therefore, the existing power equipment operation management method cannot effectively supervise the work status and attendance rate of the task executors at low cost, and cannot effectively guide the standardization, standardization, and procedural implementation of power equipment operation projects, thereby affecting power equipment. Timely and fast feedback on the completion quality and operation status of installation, commissioning, maintenance and other operation items, and the operation efficiency is low

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent electrical equipment operation management system
  • Intelligent electrical equipment operation management system
  • Intelligent electrical equipment operation management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0026] Example 1, in figure 1 In the schematic diagram of the system structure of the present invention shown, the intelligent operation management system of the present invention includes an operation item management system and a mobile operation management device supporting it. It is characterized in that the mobile operation management device includes a mobile terminal and a mobile storage operation device, the operation item management system is used to transmit the operation task data to the mobile storage operation device or mobile terminal, and collect the operation task execution status of the task executor when the task executor is performing the operation task or after completing the operation task The mobile storage operation device is used to receive and store the job task data, and display it through the mobile terminal to guide the task performers to perform the job task, and the mobile storage operation device is also used to carry out the corresponding power equ...

Embodiment 2

[0028] Embodiment 2, except that the background management system is added in the present invention, other structures and system configurations are the same as those in Embodiment 1. exist figure 2 In the schematic diagram of the system configuration of the present invention, the intelligent operation management system of the present invention also includes a background management system. When the operation item management system does not transmit the operation task data to the mobile storage operation device, if the time and If the distance permits, if the distance is within 300 meters, the background management system can be used to transmit the operation task data to the mobile storage operation device, and receive the task execution transmitted by the mobile terminal or the operation project management system The performance of personnel tasks. In Embodiment 2, the job item management system still transmits the job task data to the mobile storage operation device, and th...

Embodiment 3

[0029] Embodiment 3, except that the present invention is provided with a patrol management system, other structures and system configurations are the same as those described in Embodiment 1. exist image 3 In the schematic diagram of the system configuration of the present invention shown, the intelligent operation management system of the present invention also includes a patrol management system, and the patrol management system is used to transmit the patrol task data to the mobile storage operation device, and receive The inspection task execution report form of the task executor transmitted by the mobile terminal. The mobile storage operation device and the mobile terminal transmit the patrol inspection task data and the execution status of the patrol inspection task through a wired connection; the patrol inspection management system and the mobile storage operation device connect directly transmission of inspection task data; the execution of the inspection task is tha...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an intelligent electrical equipment operation management system mainly comprising an operation project management system, a mobile terminal, and a mobile storage operating device. The operation project management system is used for transmitting operation task data to the mobile storage operating device, using the mobile terminal for displaying, and guiding the task execution personnel to execute an operation task; the mobile storage operating device is used for collecting electrical equipment information, automatically generating an operation task execution situation report, and feeding back the report to the operation project management system. Therefore, problems of poor operation normalization and insufficient monitoring according to the exiting way can be solved. The system has advantages of normative operation, efficient monitoring, well-documented property, and low system upgrading cost and the like and is mainly applied to the electrical equipment operation project management.

Description

technical field [0001] The invention relates to the technical field of electric equipment management, in particular to an intelligent management system for electric equipment operation. Background technique [0002] With the rapid development of the economy and the increasing demand for power resources in all walks of life, it is necessary to ensure the smooth and fast installation, commissioning, maintenance, modification and other operations of the power system, and to conduct timely and effective supervision and management of the completion quality and status of the operation projects , It is extremely important to realize the safe and reliable operation of power equipment. In order to ensure the timely completion of the installation and modification of power equipment, ensure the quality of the work, and prevent the occurrence of various electrical accidents after the operation, it is necessary to carry out the installation, commissioning and other operations of the powe...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06
Inventor 张藤予
Owner 张藤予
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products