Seawall safety evaluation method
A safety evaluation and safety technology, applied in special data processing applications, instruments, electrical digital data processing, etc. first class problem
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] Embodiment 1: a kind of seawall safety evaluation method, such as figure 1 shown
[0050] Step 1: Establish the safety evaluation index system and evaluation level of seawall engineering
[0051] Establish a three-level index system for safety evaluation of seawall engineering from the perspectives of system, application, and operability, and refer to factors such as seawall occurrence environment characteristics and time scales, and combine index analogy, expert experience, and norms to establish seawall engineering Safety comprehensive evaluation level standard. For the sake of simplicity and universality, the safety evaluation system of seawall engineering is divided into four grades of Ⅰ, Ⅱ, Ⅲ, and Ⅳ, and "safe", "relatively safe", "slightly dangerous" and "dangerous" are respectively used to describe.
[0052] Step 2: Determine the composite fuzzy matter-element of the seawall evaluation system
[0053] The safety evaluation grade of the seawall project is reco...
Embodiment 2
[0088] Embodiment 2: application example
[0089] The standard seawall of the Hangzhou Xiasha section of the Qiantang River is located on the north bank of the lower reaches of the Qiantang River. It is the main pond along the first line of the Linjiang River. It protects the main urban area, Yuhang District and Xiasha Economic and Technological Development Zone of Hangzhou together with the seawalls of other provincial pipe sections, with a protection area of 1800km 2 , with a population of 2.18 million, this section of embankment permanently covers an area of 1409.2 mu, which is an important lifeline project to resist the flood tide of Qiantang River. The seawall project was completed in July 2000 and has been in operation for more than 10 years. According to the "Zhejiang Province Seawall Project Safety Appraisal Management Measures (Trial)" promulgated in 2009, "the first seawall appraisal should be carried out within 10 years after completion. Considering the With the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com