Method for lifting top ring in dome structure installation
A hoisting method and the technology of the top ring, which are applied in the direction of building construction, building material processing, construction, etc., can solve the problems of insufficient precision and difficulty in ensuring stability, and achieve the effect of ensuring precision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0014] Select the appropriate crane and spreader to ensure that the mechanical properties of the crane meet the requirements of hoisting.
[0015] The temporary steel bracket of the top ring is an important supporting member of the entire grid steel structure. The temporary steel bracket will bear the weight of the top ring and about 1 / 2 of the weight of the assembled components before the installation of the bottom ring.
[0016] In order to ensure the stability of the top ring and the lifting and unloading of the top ring, four positioning and guiding pipes of Φ140×5 and Φ114×4 are set on the top of the temporary steel support to ensure the guiding, positioning and stabilization. At the same time, four 32t screw jacks are set up to achieve the functions of jacking and unloading. At the same time, set 4 sets of supporting and adjusting backing plates, each set of adjusting backing plates is equipped with 1 blocks of 100mm and 50mm pads and 20mm, 16mm, 12mm, 10mm, 8mm, 6mm, a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com